![]() |
wnAX防身器材★★ 喷射器哪里有出售的?7K9
型号:110g 成分:强烈的辛辣素-CS混合刺激剂 尺寸:35mm*150mm 喷射距离:大于3m 喷射时间:大于4s 喷射速度:大于8.5g/s 喷射出的气雾使歹徒流泪,打喷嚏,脸部疼痛,防身器材,暂时失去抵抗力,防刺衣,有效地保护自己;使用时严禁逆风喷射
了解更多相关产品请登陆: http://www.12safe.com/ 热线: 15252628002 夏女士 加q:523553888 也可详细了解。 |
| Back to logs list
Reprinted from 419169572 at 19:29 on December 28, 2010 Reading (loading. ..) Comments (0) Category: Construction Engineering my collection of electrical installation symbols method one wire threading pipe generally have: PVC pipe: PC20,la gear, welded steel pipe: SC20,la gear mens shoes, withhold galvanized thin wall conduit: KBG20,la gears, thin wire fastening galvanized pipe: JDG20, Second, commonly used in electrical design and construction plans of laying lines: SR: steel trunking laid along BE: Cross-roof along the roof or laying CLE: laying along the column or across columns WE: laying along the wall CE: along the ceiling surface or ceiling surface installation ACE: the ceiling can be laid into the man BC: Dark laid in the beam CLC: Dark laid in the column WC: dark laying in the wall CC: laying the roof in the dark ACC: Dark laid in the roof can not enter the FC: laying on the ground in the dark SCE: the ceiling installation,la gear sneakers, wear a metal pipe one wire through tubes that SC-welded steel pipe MT-wire tube PC-PVC Plastic Pipe FPC-flame retardant Plastic Pipe CT-bridge MR-metal trough M-cable CP-metal hose PR-plastic trunking RC-galvanized steel pipe Second,la gear on sale, the way that wire laying DB-buried TC-cable channel BC-Concealed in the beam CLC-Concealed in the column WC-Concealed in the walls CE-along Tin Ceiling installation CC-Ceiling Concealed within the day SCE-the ceiling laid F-floor and floor under the SR-along cable BE-along the roof trusses,la gear womens shoes, beams WE-along the wall for surface three, lighting installation of the said CS-chain hanging DS-hanger W-wall mount C-Ceiling R-embedded S-Bracket CL-column along the steel trough: SR roof along the roof or cross : BE along the column or across columns: CLE through the laying of welded steel pipe: SC wear a wire and pipe laying : MT to wear hard plastic pipe laying: PC wear flame-retardant semi-rigid PVC pipe laying: FPC cable tray installation: CT metal trunking installation: MR plastic trunking installation: PR with cable laying: M corrugated PVC conduit through laying: KPC wear metal hose laying: CP direct burial: DB laying cable channel: TC wire laying parts of the label along or cross-beam (roof) installation: AB Concealed within the beam : BC laid along or across columns: AC dark laying in the column: CLC laid along the wall: WS laying in the dark wall: WC along the ceiling or roof surface laying: CE dark or roof laid in the roof within: CC the ceiling laid: SCE laid under the floor or ground : FC |
,la gear originals
| Back to logs list 22127072 2009 年 02 月 24 日 21:34 Reading (loading. ..) Comments (0) Category: Personal Diary | Back to logs list |
All times are GMT. The time now is 09:24 PM. |
Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum