Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums

Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums (http://www.freeadvertisingzone.com/index.php)
-   Online Classifieds Directory (http://www.freeadvertisingzone.com/forumdisplay.php?f=58)
-   -   Salvatore Ferragamo outlet qbj rqt nuqt qtq (http://www.freeadvertisingzone.com/showthread.php?t=1621644)

v5440479 08-15-2011 11:58 AM

Salvatore Ferragamo outlet qbj rqt nuqt qtq
 
Caijiapo region Analysis of vibro-treatment soft


Each share of the pile and soil stress ratio using (1) or (3) design calculations to estimate the pile-soil bearing capacity than n, using (2) the design calculations to estimate the pile-soil stress ratio n. Based on the data, is approximately equal to the pile-soil bearing capacity of composite foundation than the pile-soil stress ratio, ie 1 Thus, in practical engineering, and (2) and (3) are equivalent. However,Beats By Dre Headphones, in practice, (2) the pile-soil stress than the acquisition value of n than (3) the pile-soil bearing capacity than n 'acquisition much more difficult. Thus using (3) vibro pile design calculation is more realistic . In fact, piles and piles of soil bearing capacity ratio n ask the physical and mechanical properties of soil and vibro pile construction quality are closely related. For Caijiapo region saturated soft soil, soil pile bearing capacity than the n value of the measured results are shown in Table 2. Table 2 shows examples of the seven projects in the area saturated soft soil using vibro-replacement method treatment, the pile-soil bearing capacity than the average of n changes in 2.41 - 2.91 of the question, the value of red pile, the design of precision will increase. Because the specification of the value of n generally take 2 to 4, fluctuation range. Caijiapo region saturated soft soil strength is generally low, according to the specification,herve leger sale, n value should be whichever is greater, which will result in vibro-pile composite foundation bearing capacity of the standard value f high expectations of design errors and reducing design accuracy,Salvatore Ferragamo outlet, such as Caijiapo region for the soft ground, some impulse pile design n value is relatively high, often taking 3.5 to 4.0,MBTシューズ 販売店, resulting in post-vibro pile composite foundation well below the design value, resulting in unnecessary rework waste . 2.74. Fluctuation. This value, when applied to (3) vibration in the design bearing capacity of soil in Table 2 than n. The measured data, pen vibro-replacement treatment effects in saturated soft soil treatment tables Table 2 Tiao major design parameters of the mouth detection capacity than fI l engineering force replacement ratio f. soil pile diameter -Ira) (%) change in the range n mean n '① elements fill clay 0.9441312.50b2.892.661.6' l ② silt soil 0.940.41311.89 ~ 2.692.41]. 56 ③ move dirt O. 940.41312.43 ~ 3.632,911.74 ④ silt clay O. 85O. 33782.4O ~ 3.282.841.62 @ indigo mixed with silty clay O. 85O. 33782.37 ~ 3.1O2.741.57 @ l saturated loess 0.900.32622.26 ~ 3.082.621.49 ⑦ saturated loess 0.940.41312.6l ~ 3.192.821.75 suggested, For the saturated soft soil areas Caijiapo design formula should take (3), the pile-soil bearing capacity than n. Take 2.40 ~ 2.90, the original low soil strength to take the higher, the lower of the original soil strength to take high values. Third, the construction problems in a reasonable design, if there is no guarantee of the quality of construction, it may cause the failure of reinforcement works, the results of cost and time-consuming,herve leger skirts, resulting in unnecessary losses. Given the current construction Caijiapo region, it is recommended to be a really good job in the following areas of quality supervision. 1. Construction on the console before the meter calibration and pressure gauge i2. In detail, the construction of a true record of the current, pressure, pile length, etc., in case of abnormal quick report technical consultation; 3. Caijiapo region generally too large stone size, usually 5 ~ lOcm, and the general design requirements 2 ~ 7era, for this situation should be in the amount of construction sand mixed with gravel to reduce the gap between the gravel pile, increase density, to increase pile friction angle of the body, improve pile bearing capacity; 4. After construction of the production of mud paddle water should be discharged in a timely manner to prohibit the discharge of people stranded at the construction site or off site; 5. Should strictly follow the standard operation, and effectively control the density of current and stay-up time and the amount of each filler. Fourth, mushrooms language Caijiapo region saturated soft soil in the vibro-replacement treatment should pay attention to the following aspects: - 1. Geological survey should be preceded by careful design, accurate knowledge of geological structure in an effort to deal with vibro pile foundation to provide detailed and accurate geological information. 2. Should choose the right design to catch the pile-soil bearing capacity than the n (similar to the pile-soil stress ratio n), respect for the soil is saturated. The range is 2.40 - 2.90 should continue to accumulate experience, expect to improve (3) design accuracy. 3. Specification of construction should be strictly enforced to improve the pile material (gravel) grading, the real record, the same anti-temple construction issue. More articles related to topics:


vibram five fingers outlet pjr ddz htjc kxi

Beats By Dre Headphones xrp ueh xfod igc

l1oe3tr3sbon 08-15-2011 12:24 PM

  
  曾经拥有的我不曾忘记,
  
  ­现在失去的我无法挽回。
  
  ­不管是曾经的幸福,new balance womens shoes
  
  ­还是现在泪的苦涩,
  
  ­那一切都已无所谓!!!
  
  ­但心里依然深藏一份爱,一份希望,
  
  ­曾经的那颗心不曾改变。
  
  ­任时光流失,岁月蹉跎,new balance 996 for sale
  
  ­我心依旧!!
  
  ­回忆曾经,我微微一笑;
  
  ­面对现在,我沉默无语。
  
  ­我曾付出,我曾努力,
  
  ­虽心中没有悔恨,
  
  ­但淡淡的爱恋却是那么的深。。。
  
  ­时间一秒一秒的过,
  
  ­日子一天一天的走,
  
  ­我要用我的心去等,new balance shoe store。。。。
  
  ­等那不为人知晓的结果,mens new balance 576
  
  ­人生如梦,new balance shoes for flat feet,浮浮沉沉。。
  
  ­我认了。。。。
  
  --斌
  
  QQ:1025329228
  
  


All times are GMT. The time now is 07:30 AM.

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum