View Single Post
Old 04-30-2011, 06:45 PM   #1
aqiuma520536
Major
 
Join Date: Mar 2011
Posts: 604
aqiuma520536 is on a distinguished road
Default sky dresses Premier Wen Jiabao made ​​arrangements

According to Mao Shengwu , at present, most of Zhouqu county flooded or soaked , lake water levels are in general stable,five fingers by vibram, six in the morning more than a drop of 40 cm, but the general The situation has not changed ; have to find the bodies of 80 people,vibram shoes, does not confirm the number of people missing , but to determine this number will be relatively large ,印度新德里一多层居民楼发生坍塌, the relevant state leaders have arrived or are being rushed to the scene , now is the first save ,pronovias wedding dresses, In addition, the handling is top priority lake , as it relates to the safety of downstream Longnan City .

Gansu TV news,paul smith black, Gannan Prefecture Governor Mao Shengwu just received a call from Premier Wen Jiabao ,周永康参加黑龙江代表团审议, Premier Wen Jiabao asked in detail about the phone in case of disaster , and go all out arrangements for relief and rescue work .

Maosheng Wu said that the new flood peak along the Bailongjiang down soon ,法学专家称中国30年内不会取消贪污贿赂罪死刑,sky dresses, is expected to peak in 5-6 hours will be achieved. Stricken areas of production are being actively help themselves .
aqiuma520536 is offline   Reply With Quote

Sponsored Links