Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Free Link Exchange

Free Link Exchange Free Link Exchange

Reply
 
Thread Tools Search this Thread Display Modes
Old 08-21-2011, 11:56 AM   #1
SW3c5k3b9jn
 
Posts: n/a
Default 200 {elaboration} tips ( {marital}, no{marital}ed

1, the section will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to slope either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To go off electric, pull the plug dangerous

3, sun angle on tile part of the treatment, in the final analysis is to look at worker level. If the level of good workers, plasterers, tile tools and wear better, they should not hesitate to choose the train of grinding 45-degree angle. In effect, as long as a good grinding, grinding 45-degree approach angle of the sun angle is the most beautiful! If the level is indeed not very good worker, then you still choose to use positive angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without any decrement before the final test.

5, when the steel doors steel doors must be considered a good size frame protruding walls to accuse the installer, making the final border and had finished the wall tiles are flat, so not only beautiful, and good health to do.

6, carpenter and mason's Door package is to tie the tiling, including door pocket of time to consider the following ground (the ground side of the door both side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door

7, under the mattress and bed board must be breathable. Bed board is generally best to use cedar board

8, do the paint as much as paper tape

9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coating iron plated, ah, ah what kind of paint, easily disappear.

10, It’s about time ceramic basin basin, glass basin downright Health

11, water reform arrange to be their own nice, query them to open the straight-line Cao. Watching them draw their own line, the whole line open at painting Cao. Each have their own approval Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal accord into the gap checkout slaughtered, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!

14, ground floor, if installed, to re-do always the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as much as feasible to install the power plug.

17, is still to be done outside the shower toilet partitions. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to select carefully the material.

19, before installing the cabinet must be sure your home's water is OKAY.

20, kitchen floor tiles will not pick white.


21, paying particular attention to the ceiling smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy the things you need to install those peddlers will be required to install, it does not contain installation, after installation, it must adhere completely to pay money! !

24, decoration, your previously collected business cards contractors carry

25, Lvkou Ban protective movie is best removed before installation.

26, the boot is best to use curtain, anti-odor. You can leave a boot outlet side, to plug singe shoes.

27, where the cooking can be a small security lights.

28, it is convenient restaurant exhaust fan can also be safe, so when you eat hot pot or do not dirty barbecue house hall ceiling.

29, the door is best placed to sort a debris of the cabinet, can be placed above the shoe. The common things, such as umbrellas, bags, scissors, coins, and so eat of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a passenger guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the web color, especially the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his grasping mind, do not believe selling the vision of smallpox, their eyes Barbara taint.
4, staring at himself in the scene, while income is important, do not let them lax, or leave the black seam, how to look how ugly.

31, third day of the main hole and continue to paste tiles, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be selected before the hood, stoves and water heaters, etc., to determine the hole size.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the framework of internal and external sides of paste porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not beat.

33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, accepted 2-3 road on it. Pihui acknowledged when a gray polished once, and then paint brush after brushing but also lustered, and finally twice with ICI paint brush, the whole wall look smooth and smooth, really good. Upon completion of the ceiling wall, woodworker started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside glue veneer, although there is no furniture store to buy so good-looking, but durable, quality should be better than buying. I am not fearful of standing container board. Buy probably will not work. Backplane is relatively thick, thin to buy that.

34, while additional students in the tiling have to note the following:
① best he can in the field.
② some of the less perfect tile can be additional to the future of some workers to see the location, such as cabinets, sinks, mirrors back, but also pay attention to tile, brick, etc. Do not waist was attached to the above location of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the overflow damage must be enough time.
④ Be sure to drain plug with someone good out of concrete down to discourage clogging. My home out for the cement layer drain is blocked, it took 30 management office to ascertain clear, get up a lot of small dirt.
⑤ at the scene, the workers will not be too consumed tiles. Tiling my family when not at the scene, then go, consumed a lot of brick, very melancholy, all perspiration Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then deduct a window and door area. Finally, count the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.

36, the best is a two bedroom roof light control, and a door, a mattress, a mattress of winter save up and then rotate off the lights.

37, the socket must be considered a good location, height, interval. Even first play location having steel cassette, put away after a cassette is found just by TV cabinets, microwave, table block, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good fit stainless steel cabinet legs, only customized aluminum feet.

38, just around the corner in the hallway like the one installed, that there are bright effect.

39, when mounted lights did not consider the placement of the table, the table now is not in the medium of light.

40, bathroom tiles do not use too much dye, one easily dirty, and secondly, a long time too dull!


41, outlet to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to cling to.

42, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.

43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.

44, playing in the balcony on the altitude cabinet on the back of the cabinet, then a layer of foam board insulation with water works well. Balcony door is best to use the same type of launch board. Balcony environment is bad.

45, if no suitable molding may wish to order, custom-made quality also seems better than the sample. More personalized and customized.

46, bathroom floor cabinets with stainless iron legs are big profits, the back of the store to find some location to buy cheap price mad.

47, install the door lock head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.

48, Paco floor well, I like only to remind the owner to speak directly to the price and the seller to talk about than the price better.

49, matte paint is high and the light beautiful

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box used, electrical suggestion put In the indoor ones, and now he found this proposal very valuable.

52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.

53, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.

54, without any modification of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put forward. Ding Jiaoxian angle helps to play a straight line.

55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean pellet handling is very fitting.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.

57, frosted glass,GHD Black Styler Straighteners, not stained with the back of ten million to protect the paint, is difficult to clean!

58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.

59, the price of luxury automatic racks too much water, and found some of the more well-known brand is not on the structural design but better than the brands, prices are much lower.

60, could be considered secure on the ground of the metal socket, the socket 100 is very expensive, but very handy, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table below, to insert pot (to prevent hanging back and along when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty raiment cupboard.

62, starting bed frame (the so cried it). I am a professional company to buy the fabric bed, bed, and spent 350 yuan plus a such a thing, end of the bed there is a pluck handle, bed board will turn up, exposing the base of the storage space, Terrific Oh!

63, is not practical double-pole towel rack! Current and single-pole uses the same basic look inside layer will not be hanging pole and then drying towel

64, that is not practical cabinet inside the litter can, as on the outside. There do not setup the door and the table plate of the trash binary,GHD Carry Case & Heat Mat Straighteners, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, on I calculate the mop pail less demanding in terms of rendition, tin assemble one yourself out, covered with tiles and match the surrounding environment alternatively the mosaic that is pretty, and save money.

67, the bathroom can identify fasten point of hook to hang something.

68, designed a bathroom cupboard to put clothes, no longer have to worry about bathing forgot to clean clothes.

69, suffered a caustic practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the malign giant. Thick clothes, towels or drying quit, let the sun more than a good user disinfection. Even been amplified, you need to save the point of silver.
70, even in the laundromat room to do a laundry pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundromat pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.

71, fitted with lights is not really practical, not the decoration finished now opened. There are equitable SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the aboriginal is to open PARTY beneath phantasmal, immediately do not have much become of beginning spotlights.

72, most fitting experience is actually as simple as possible, less pollution, less money, peace of mind.

73, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing dishes and vegetables.
③ bathroom to wash your cilia you can pull out the actuator. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.

74, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...

75, posted WeiChu tiles after a good amount of what did not dry before the best level, the lowest point is not to look at the leak, or other dry and then passing the buck and decoration team, a lot of die cells.

76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers slit good milling, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use transparent glass, so there does not seem cramped shower.

78, should not use white cement tiles pointing nail. No month into a black sew, ugly necrosis. The results they have bought their own hook pointing agent, that tired

79, the cabinet should be under the synthetic stone after the board of the pad, the result is not found after installation, are now afraid to cut the meat in the above, promised to give me almost two months have not installed installed (only to grinding a).
80, do not deem the spell of the designer. Of course,GHD Hair Straighteners NZ, you can visit more than several elaboration companies, from each design to extract the real profitable entities, the opener is you want to pretend to see like home improvement.


81, if the floor drain installed the original developers have the kind of damage smell of the

82, attached bathroom floor tiles after a good test the water, if water is relatively slow immediately rework. Our household's water is relatively slow, then relented a bit, now it is always a little bath water, and made hundreds of our main Guardian silver shower head is laze, it always surprising how to cure.

83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack respective position.

84, to consider when buying a mirror the mirror front bulbs, if you do not want to install a transient mirror front bulbs, mirrors the size of the mirror to be able to cover for the best line of headlights kept.

85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder among the debris. Both beautiful and practical

86, must be looking at doing upstairs upstairs leaking water .... otherwise, get a hanging cabinet, the wall is a muff ....

87, do not blindly emulate the buy online, I later discovered that some of their own to buy cheaper than the bargain.

88, television wall must set a few more outlets, television, DVD .... a put, you will find ample outlets.

89, change the water well in the future to be considered before the installation of a large specimen of clean basin, for example, the left or right jugs pots, water and drainage that is situated where. Otherwise, changing for the better after the finding phase of the wash basin is eligible!

90, on the shutters, we had better put your linger a size goes, the employer shows no less size. If less, then how come the. Or saw him cut his cloth.

91, the decoration of the construction process:
(1) approach, cutting down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough, water reform and acceptance.
(4) stamp groove secret underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) synchronous product of wooden doors, door style and platen.
(9) wooden panel paint brush dust (food vegetable oil).
(10) window leveling laying marble countertops.
(11) trim panel, pasted, fine line production and installation.
(12) wall of primary treatment, grinding, leveling.
(13) apparatuses, door seams paste adhesive (defended side).
(14) ICI at fewest three times the oil the wall.
(15) furniture painting reach, eye patch and paint.
(16) dealing with turns, laying floor tiles, wood or composite wood flooring, waterproof cruel bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) washing health, tiles fill joints, dismantling.
(19) decoration preparatory acceptance within the company.
(20) three formal acceptance of assignation, delivery owners.

92, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the most, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do.

94, take the line in order to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of ligature, leaving a track of regret.

95, the house in person to measure and log the various sizes available, can be Broche size chart size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.

96, the small size of line is not good if the election is not all black walnut air, then the need for trade-offs, or to adjust actual or devoted their own minds, of course, the best do both

97, began looking for decorators. In terms of private experience, if necessary especially large family and plan to easy decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have read and engage to the eyes, especially the feeling of the person in dictate of the decoration is even more important, liability and appreciation of how, some of the sometime is more critical, because if not a stripped-down, in fact, those who live virtually fooling the will to do, but the quality is good or bad may rely on a sense of responsibility.

98, the cardinal furniture such as sofas, closets, dining charts, chairs, cabinets, etc. in advance to penetrate more of the best too, if the escaping approximately on weary, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you must do is slowly according to their lusted style filter out the right asset. Some people take a good manner, some people have exactly grasp of color, it does not stuff, anyway, there is time to consider, if you await until cleared decoration, furniture, assist wanted to see the treads and then reluctantly approved the inevitable end will not actually like it.

99, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.

100, buy something essential documents be sure to keep the shake on the latter may exist back, a replacement is absolutely useful. In particular, some momentous items of the store receipts, pamphlets, etc., because a lot of things have a engagement period, testify lost would be more trouble.


101, the process of construction projects are sure to boost or reduce the price they asked for and then write it in dark and white.

102, check for the necessary construction of protective fathom, such as entrance doors to use pearl cotton wrap, window and floor tiling good must be properly protected.

103, as much as possible to communicate with construction workers, to decide whether he understands your directions. Put themselves in respect of every teacher's work, esteem, the magnitude of people feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning tease who, it would must retaliate, dispute) of special note to some of the edge of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their relative duties, Otherwise, we pass the money back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, at the peak of he is willing to help you find a way.

104, do not do the best furniture firm, because it no longer may be some changes in the layout. If we do we must grasp the quality, or infinite troubles.

105, be sure to change the water cautiously, one costs money; second, if it were not for the ceiling from the floor must be laid down in water,GHD Kiss Styler Straighteners, if water problems big trouble.

106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the napkin with a lot of lights and lighting if necessary practical, we must also try to avert the series to use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, and often with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe device can bake, I am now very apologetic that no cloth lines.

107, the bathroom as wet and dry area, if the area is small with a pedestal like (special glass basin was dirty, slothful remind); conditionally set a waterproof cabinet incorporating a small debris is best, put everything certainly does not look good on the outside.

108, wood glossy white paint brush than when the nitro-polyester good (this is to hear to experienced painters speak).

109, the cabinet must be selected carefully, to look at several of the quality, we go to do a solid strong as this one are easily thousands of ocean, but also related to the stove and sink, etc., they still do not blindly ravenous cheap good. But best not to do in the cabinet table or inside the trash can; if there is restricted funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.

110, wardrobe rather than not less, preferably large not small, women remember! Hanging space to be able to put up the clothe.

111, bad handling cup or mirrors in the vicinity of the best things to buy, or Be ready to transport methods.

112, curtains all the best in furniture, appliances and then customized approach to match the overall style tone. However, before cleaning the pathway can be installed.

113, change the gas pipe is best done before tiling, or may break the wall. Best to let the gas enterprise to draw a figure or on the wall as an arrow, because the cabinet company to be necessitated in the cabinet body openings.
114, cabinet installatiin due time is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see via the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes chose, I was not looking at the results too small a distance among the layers, hanging clothes extend not open, even after adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture in all the open doors the emission of odor, but also buy a special spray to exclude the smell of things to come.

117, installation of combustible gas, reservation gas ignition.

118, brush lumber of the time: the best Puwan other room painted tile or lumber floors. If you must brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily attached to the wood surface, wood productions, have spiked sense does it feel, which however can be higher tag of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall achieve will be discounted RBI hit. Room Puwan tiles and then brush, then the air of dust content in the absnece of than the shop front, with virtually not brush again after the dust spliced to the wood surface of wood products. This is so because when they run into a small decoration Wu case, I had determined to buy in Canada Wood had seen it like a brush efficacy, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to activity a lot of discounts, it has been a matter of regret Xiao Wu. And and I like the organization buy the paint process, the students also emerged in this home. So here prompt students to pay attention to it. I do not know whether other wood circumstance, but according to the rule of same cause, so here remind students to pay attention to it.

119, on up painting: painting teacher pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a diversity of electrical switches. Ask something to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to determine the paint division team to pay up painting again, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting department to pay smeared walls, you can pay less to make a junket to the paint division (at least half a day), but also assist a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall clash. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior acceptance has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the duration. If the alarm of affecting the duration of the case, but also in the air to reduce the effects of dust, then a lot of points to be industrious about cleaning the room of the health of the.

120, the decoration crew selection: The first alternative guerrillas or formal company, I think is not important, the key is to give you the head of the construction team is solemn and responsible, the decoration of the skills of workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part, so, if your time is very rich, it is distinct matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the following ingredients to decide which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as low as possible, of course, inverse to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to guarantee. Fitting so many, you want to unattached item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact, are of great stress.


121, the construction? Since I am in no hurry to move in, so plan to find casual workers: the neighbors a good home please artisan, may be I look in the object: a mason, a carpenter, a plumber, a painter. Design step by step step by step, I believe it slowly and accidentally.

122, to use every penny wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can resist . May be a short period of time necessary to purchase these things in place, the economic pressure is really big. Most people at this time is often in muss, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined amount, behind the election matters.
excess of the anticipated price of 10 percent-of material merchandise, do not waste time. Business consumers always fine too. I am doing a detailed schedule of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problem areas are transformed, kitchen water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter common furniture.

124, covert project was not the most important place to save money: water circuit transformation, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circumference is $ 20 for half a annual warranty. B & Q on the first floor in the east of the detailed individual services and offer announcement, we do reference

125,, the easiest access is to use online resources to gather, retain, finishing the integration, the future will be put to large use.

126, in order to save time, enhance efficiency, decoration materials on the market each have a farm, a detailed and practical acquisition schedule and budget is important.
Program list by room classification purchase is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
together, likely to have success.
one hall project
Second, the alive chamber project
Third, the restaurant project
four main bedroom project
five children
six housing projects, study projects
seven main Health Project
eight, nine tourist Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the following table, for reference: file in the table as an instance.
This catalogue is more convenient for procurement planning, pre-construction projects may be appropriate, by job re-classification of the combination, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be joined in the If (three batches of three wall paint brush; shoe with Albert plate, brush polyurethane varnish), etc.

127, home theater rear speakers, the sound to be embedded wires in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need background melody, sound audio wires embedded before the renovation.

130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.


1: the lavatory is divided into rainy and dry zone 2 wet zones of the floor drain on the better
2: If you flame natural gas water heater attention to the bathroom to have ample ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to accompany the master now lie more.
11: hydropower, or find professionals to help themselves because the functions in this respect he is to inform those who design their own needs to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and must re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their choice to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can rest assured water to do well because of design problems in the choice of size If you encounter after the designers got the idea he would not cut off the bricks to fill the ground so that you broke the original design of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term guarantee so you must pay attention to the design of the bricks in the sidewalk without creature destroyed
19 when the composition is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to establish the design, of course designers in addition to water designed to inform the designer must determine their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more cozy with the cabinet panel recommended to choose such a large load to bear safe



white cement tile grouts and usage is not the same, but the masons are usually filled with white cement tile grout filling method, so epoch, gone sealant, sealant, and a little bit better to be pointing to the wall instead of act the paste. Also, the cabinet hinge, pond water, so use a good switch, meantime the cabinet fabrics, pool compartment body, bolt can be used in general, of course, if you will not care about the money.
If not a big package, I suggest to buy establishing materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned.
131, at the entry to the light switch, it is recommended to use sensor-based. Black daytime to go home, save the black.


132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the walls to do it twice, extra than 30 cm can do it anew, coat absence water by the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most threaten to


134, tile
(a) in the selection of tile employers of tile required for quality finds its way: first look at its color is uniform, non-variegated black blots and holes the line; followed depends on whether the standard of its size, the amount of tiles with the tape measure the length and width, measure the size of the trademarks to its factory the same size, then the amount of its crooked tile, such as diagonal line, the tile is assured; then depends on the flatness of the tile, the most simple and efficient method is to tile the same brand of two overlapping affirmative and negate, such as two stacked meaningful gap between the tiles or you can turn the tiles uneven; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole chip of brick tile hollowing (partly hollowing the plenary chip of brick can not surpass 20 percent), if the plenary piece of brick hollowing be rectified, under normal circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the loss of) from them, such as Over this scope, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in increase to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the incline, if there is no special reasons, there is water.
(d) in the wall and floor tile Puwan essential after the


135, anti-termite
(a) and finish the wall after garbage collection trough, a comprehensive anti-termite (ie, whole-house spraying of termite pills)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the drug is better (you can clearly see the wet)


136, the computer is also a design study, and now the calculator has multiple functions to set the decimal point, making computing time will have different standards, so we need to bring a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to prepare their own two good independent glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for bargain, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them needy quality, the future is easy to change color or moldy.


138, if it were not for a last resort, do not use toilet seat shifter. This stuff is very possible to cause clogging toilet bowl water.


139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and remove the hood to install, disassemble dismantling equipment, workers are engaged in out of fashion, has chance a seamless ceiling ceiling of the seam.


140, if in order to unify pulchritude, kitchen and bathroom doors are installed, and that soon after installed in the door marked with ground glass joints where glue. I do not have time for the processing, water workers are not cautious, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family outlook balcony to balcony wall angle and the life is not paved, but to arrange a bucket of appearance wall, they sometimes activate ... ...


142, sealed in the wall before the water reform must permit the main to cater detailed decoration water chart.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning channel morsel all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future livelihood. Later, brushing the wall paint color, etc. only to find how these pearly glare, apologize ah ~~~~~


144, which is the lowest class I made an misdeed, I assume that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to stay well back of the wall socket. As a result, there is no socket to be blocking the way to use.


145, started before the captain to make thinking of the wall decoration how to handle with the need to spade out all the original powder. In particular, ready to paint the wall engineering companies outsourcing to students. My family is narrow out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to spade out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line will surely be re-wiring. But from the nearest extremity branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control switch only in the power afford side. Added line on the road is not allowed.


148, change the situation of phone and network lines, they can out of the original cloth of the line to proceed to use. However, if the unsuitable construction there will be numerous hidden perils. So it is best to box from the room for weak lines.


149, the transformation of the workload dimension circuit, generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more basis canal, according to the number one half pipe the other half included in the overhead line).
(2) on the head of line (dressing tube not play slots), calculated according to the width of pipe.
(3) for cable, according to how much even if the number of replaced (replaced the line to narrate the construction team do not throw).
(4) weak transformation, according to the 1st method. The difference is who is to disburse attention to weak-line purchase. Owners will have to buy less wire prices.


150, nailed the toilet to the floor, hit the screw with it? There is convergence at the found and the pipe, to buy what were sealed and the outside is better: the toilet is nailed with the expansion screw. The interface between the base and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must first enumerate the approach quantity. To buy water when the material to do the latter anyway, thinking almost painting with the sea chart in the end how much material came out, so what mini confidence the foreman, the result was found to buy water 5 meters, the actual use 27 copper brain one, really bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated questioning from other sites behind up foreman Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 wire meters, network cord from 20 m to 13 m, other issues such for insulating tape, plug both large access was I correct ... ...


152, if the old water pipes under the ground, in addition to the drip when the switch is often damaged, do not hesitate to be laying a new, do not save, to ensure safety .


153, the kind of retraction on the bathroom walls, the glove do not waste space, and posted a very good very nice tile. Of course, tile alignment that trouble to say


154, sun angle tile lines do not use the income side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed strong, and loose some of the good thing.


156, lobby bathroom on the ground if the ratio is high, the conversion can be used to solve the door stone.


157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results .


159, purchase Lvkou Ban particular care to the keel and no Lvkou itself (Lvkou goal is not easy to meddle too many), normally on the keel complete specter.


160, brick color is complicated to find satisfactory, I did not find, but the 2 varieties of color are not satisfied with staggered mosaic sub 45-degree angle I was able to effect satisfactory results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water offensive to use my bricklayer but not directly in consensus with requirements of darting on the ground, it can even do! It is not the best yourself, do not bother but insistent.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of fast drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and beautiful, I think it is rubbish. On the contrary larger slope water to immediately run a clean is a very refreshing thing.


163, platinum-point doors fire with the LG plate, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not fine, for reference only.


164, sink a large market brand-name price is not cheap, brand-name quality mad bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good fit.


167, the glass is massive stuff, the best buy in the vicinity, or Be ready to transport methods.


168, install the bolt lock head to pay attention to some wax, wax on and then breaking too late. If you do not cigarette, then also pay attention to the door knob to prevent wall damage.


169, matte paint is pretty high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not trick your


170, with insulating tape and raw materials do not buy in the store, massive supermarket quality was much better, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.


172, installation and atmosphere leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable suggestions. On the interior door is not ugly, it really easy to use!


173, large interior design company directly to workers on site clearance work package may be more appropriate, and better technology, tools, more


174, and air leakage protection switch to use the brand label. I use the Want to buy the real thing is simple, straight phone check MGE headquarters phone digit, and then played to ask the local branch digit.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin brim, leading to the mouth longer.


177, the cavity before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the lavatory is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.


178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important factor 7,8 can also be used, case in point, aluminum window frames with internal Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, merit for money!


179, triangle valve should not be omitted, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if only installed, only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the inner leakage, the total leakage due to pressure some time to test out the terminal installation of internal and guiding it more secure.


180, even the diary has been renovated to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, is not the place,New GHD Professional Black Straighteners, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the formal management fares, tariffs, fares accounted for 75-80 percentage sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go appearance the floor water, since family improvement is to give a time bomb, who state apparently whether Shashi Hou as his distress.


185, if the separate tube wear, but in a tank, the impact it? Effects can endure


186, ask what between the dining and living room separated by the most cost-effective archive door pockets, side bag only 6 cm or polluted with white, height 2 m is not significantly large High crude.


187, respectively, to strong and weak electrical displacement pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can see the tube.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.


189, PCT embark and the cabinet can be wood gist board 15, the back of the 5 accessible folders, Wuli. Package doors and Tizi use nine per cent. Different processes with alter materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are entirely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leaks, high water of green materials.


191, paint board is good, the advantages of both wood and composite.


192, do not print for a long time on the wet artificial stone, unless you want to dry a typography table; not take long wet cutting board on the table. Wood wet sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas measure cabinet door sealed in it? Need to use the shutter-type door it? Regularly check the air opening on the line.


194, clear contracting the tx Please note that you must verify the renovation team to open a list of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management almost doubled.


195, the size of definite planned sanitary ware, the best limn in advance, calculate the size.


196, buy the product the students pay attention to the door, if you want to chase results matching panel with a business package Door, then you may have to be Henzai sword it!


197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, by the time workers are not thoughtless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of elements in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm precision, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable at the same time take the call and network, will not interfere with each other it? Not. 1,2,3,6 buffet the cable module, 4, 5 playing on the phone module, and the other two easily. Right in saying that my experience: 10M 1236 100M to be accustom with the fact that the speed to 10/100M that we will not feel any difference if using a 8pin line, then some program-controlled switches marking will reason the network signal interference in the home environment generally will not have anybody problem. But rest insured that I can suggest such a separate path to the future, leave margin, cable is very low you mention?


199, check the distribution box must be properly installed.


200, fitted bath and shower faucet lesson taps connected to the tube is embedded in the wall, I have repeatedly told them to get accurate measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the coerce was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the leader,GHD NZ, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 10:45 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum