seven connections and one leveling refers to land (habitat), after the adoption of a development to reach with the Sheung Shui, rain water, electricity, heating, telecommunications and road links and site formation conditions so that developers can enter the secondary After the rapid development and construction field. Including: through water, through drainage, electricity, telecommunications, road,
air force one low nike, gas, through thermal and site preparation.
directory
conceptual content of water pass through the drainage of gas pass through thermal electricity power RoadShow the roads seven site preparation through a new concept of peace and the concept of leveling the difference between
qualification of one level, and site preparation conditions for the two developers to quickly approach the development and construction. In Urumqi, the national high-tech zone's seven and one was flat and soft environment is the hardware basic conditions has been with the case, for business services to achieve the access to information, financing, personnel distribution, service, communication, policy clear, the legal system along through life will pass a new concept. General water content refers to water planning area is open. General design requirements to meet the needs of normal life and work. Design requirements: water supply planning work to meet the needs of a normal life. Design and construction of main elements: water supply network planning area by planning area at highest water consumption design, the diameter of pipe sections shall meet the requirements of water pressure.
Garden Industrial Area of Dalian has completed seven and one leveling works
Living with water supply network planning area required for counting the service from the ground water pressure, according to the building layers determined. Deficiencies in water pressure booster pump station or reservoir regulation to set the pumping station. Water supply planning material selection is generally based on the amount of water transportation, pipe work pressure, soil properties and water supply and so determined. Construction of the main requirements: meet the water supply and drainage requirements for construction and acceptance by the construction side, supervision side, the design side and construction side organizations such as inspection and acceptance. Here the drainage through the drainage of the planning area, including sewage and stormwater discharge. Design requirements: planning area, sewage, drainage open. Design and construction of main elements: planning area according to design requirements of the laying of the sewer and storm water systems, and the planning area wastewater and stormwater diversion of life and entered the city's comprehensive drainage system, the piping material, layout, depth must meet the design requirements, construction completed Acceptance must meet the appropriate standards for municipal acceptance. Construction of the main requirements: meet the municipal drainage pipe and channel quality inspection and assessment standards, by the construction side, supervision side, the design side and construction side organizations such as inspection and acceptance. Planning area through power cabling is completed, the general power to meet the requirements of normal life and work planning area needs. Telecom Communications is the basic communication facilities within the park flow, communication facilities means: telephone, fax, email, broadband, fiber optic cable. The need to pass gas for the gas or gas standards set by the planning area, gas used to meet the overall planning and usage, in line with construction of urban gas distribution and acceptance. Heat through heat supply planning area means smooth. Design requirements: planning area electricity, telecommunications, gas, heat a normal life planning area to meet operational needs. Design and construction of main elements: the planning area according to design requirements laid out electricity, telecommunications, gas, heat pipes, the piping material, layout, depth must meet the design requirements, construction completion and acceptance must meet the relevant acceptance criteria. Construction of the main requirements: compliance with building electrical installation inspection and assessment of project quality, construction and building cabling system and acceptance of construction, urban heating network construction and acceptance of, urban gas distribution requirements for construction and acceptance by the construction Fang, Supervisor, Designer and construction side organizations such as inspection and acceptance. The roads leading to the city planning area is the main road and the region linked branch roads open. Design requirements: planning area and planning the main road leading to urban areas linked branch roads open. Design and construction of main elements: planning area of flexible pavement and the road is divided into two types of rigid pavements, flexible pavement design planning area with double circular vertical uniform load system under the multi-layer elastic continuum theory,
nike air force 1 high, to design the road deflection is the overall stiffness of the design specifications, calculate the thickness of pavement structure. Multi-layer pavement structure completed by the computer system, it can be translated into the equivalent three-layer system of law after the investigation is calculated nomogram. Graphic design and vertical road design must meet the appropriate urban road design standards, construction inspection must meet the appropriate standards for municipal acceptance. Construction of the main requirements: meet the acceptance of municipal road project quality assessment standards, by the construction side, supervision side, the design side, organizations such as the construction side inspection and acceptance. Site preparation that will require the construction site (within the red line) of the natural ground level by manual or mechanical Watian transformed into graphic design needs, making the construction site of the basic formation, without mechanical formation, formation to enter the construction of simple artificial state. Construction site to ensure that no obstructions, the felling of trees within the construction, transplant is completed. Coordinates of the building to meet the measurement, elevation, flat line of copy construction site needs. Design requirements: Landscape planning area to meet the leisure needs of living. Design and construction of the main content: The construction of the local environment, namely buildings and between buildings, between buildings and roads covered by requirements of lawn, planted trees and shrubs, interspersed with sculptures, fountains, bridges, water, pavilions and other architectural pieces, so that the entire environment to Planning District landscape planting design requirements. Construction of the main requirements: meet the urban greening project requires the construction and acceptance by the construction side, supervision side, the design side, organizations such as the construction side inspection and acceptance. New concept of seven and one leveling of the land development and infrastructure building concepts, and Urumqi National Hi-tech Zone's seven and one was flat and soft environment is the hardware basic conditions has been with the case, for business services to achieve access to information, financial intermediation , brain circulation, service, communication, policy clear, the legal system along pass, life will pass a new concept. Informed the development of the enterprises provide a lot of contemporary information management and technology sector and to promote sharing of information resources; financial intermediation is a good prospect to provide loan guarantees to SMEs, corporate finance solve problems; brain circulation plan is to implement all kinds of talents,
nike air force 1, Optimization of personnel structure; service implementation of personalized full-service communication system, so heart to heart, face to face services in place, the implementation of place; policies to ensure smooth flow of enterprises in the zone of preferential policies and supporting enterprise development policies in place in time; legal Shun create a fair and standard legal environment; life will pass to Urumqi truly become a national high quality living environment, the charm of New Eco, the strength of New, New Harmony, for the life of people in the region to provide high quality support. Seven and one leveling and leveling the difference between 1, leveling (water and electric power supplies and roads, and site preparation) is the construction of temporary facilities, use of materials,
nike air force one, construction, maintenance has temporary. Seven and one district level is the construction of permanent facilities, the use of materials, construction, maintenance and acceptance must be in line with national standards permanent. 2,
air force one low, the leveling of building units and construction units for the site construction needs, carried out under the construction design construction deployment. Seven and one level living and working in accordance with needs of the entire community, carried out by the Urban Planning and Design Construction of residential facilities design. 3,
air force 1 high, leveling is the construction phase of the construction preparation. Seven and one level is the late stage of construction of residential facilities construction and implementation phase. 4, completed the leveling is complete the construction for construction projects, the construction team can be admitted into the normal construction. Completed seven and one level to complete the construction of residential facilities, the district can be delivered, residents can move into a normal working life. More Atlas Atlas entry Open Category: construction, real estate I have to improve the