Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Safelist Directory

Safelist Directory Safelists will also work if you use them. The bigger the list the better isn't always true... sometimes the smaller lists can be just as responsive if not more. It all depends on you and your dillegence.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 04-22-2011, 08:20 AM   #1
self0715
 
Posts: n/a
Default Office Professional 2010 Key TERMIS Accumulator Op

The computerized Accumulator Optimization module from 7-Technologies minimizes the operational price of your district heating network. The most effective possible creation circumstance is chosen to make certain minimum manufacturing expense. The Accumulation Optimization module encompasses the heat volume supplied to the consumers in the network while also using the flexibility and dynamics provided by the accumulator tank. ,Office Standard

It also provides for the accumulated heat loss and energy consumption in the network, the hydraulic constraints as defined in TERMIS Operation and the forecasted load as a result of predicted outdoor temperature and wind speed conditions.
Operational Value Savings
The computerized Accumulator Optimization reduces your energy costs with approximately 5-10% depending on the flexibility and variation in fuels. This will not only improve your economy,Office 2010 Sale, but also reduce the CO2 emission.

The use with the Accumulator Optimization will see fewer boiler start-ups. As a result of this the maintenance will be reduced leading to an extension from the life span of these units.

The system can be completely embedded in your SCADA system and be provided by your usual supplier. This allows for an uninterrupted supplier support and you can work with the supplier you usually do business with.

The module requires limited or no intervention. The module is in operation around the clock. Save money all the time – every single day with the year.
Accumulator Optimization
The Accumulator Optimization module uses SCADA data from the district heating network,Office Professional 2010 Key, creating the very best possible basis for the optimization.

The module allows for common operational changes and adjustments such as valves being opened or closed, consumers with varying consumption,Windows 7 Starter, and variation in load during weekends and holidays.

Unusual operational interruptions, such as boilers being out of operation, will also be included in the calculation to provide the most beneficial status achievable for the operation at all time.

TERMIS Accumulator Optimization continuously performs a load prediction for example based on a weather forecast downloaded from the Internet.

Based on the input stated in the preceding and knowledge of the network capacity, defined constraints, etc., the Creation and Accumulator Optimization module provides the Operator with a schedule for the operation of your plants. Based on a manufacturing cycle of 24 hours, the schedule defines which plants to be used and which boilers. The outcome of such a schedule is a reduction from the manufacturing cost and an operation circumstance for the accumulator tank.

Plant Scheduler is required in case of three or more plants.
TERMIS Real-Time
Your existing TERMIS model can be utilized directly. If you are using an alternative modeling tool, this model can be directly and easily transformed into TERMIS.
Implementation of your Accumulator Optimization module requires no knowledge about the operation of TERMIS.

The TERMIS Operation Real-Time functionality can be used to display full and dynamic results for temperature,Office 2007 Enterprise, pressure and flow. This will provide you not only with the perfect overview but also with a lot of information about the operation of your network.

Send calculated data into the SCADA system. This will provide a better overview and possibly postpone or eliminate the need for adding new and costly measurement points.

Worldwide TERMIS Operation is today the most widely used simulation tool for district energy networks.
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 11:29 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum