Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Post Your Free Ads Here in English for Advertising .Adult and gambling websites NOT accepted. > MLM and Network Marketing Ads:

MLM and Network Marketing Ads: This section is for posting your free classified ads about MLM, downline, upline, matrix, affiliate programs, and other opportunities to help you earn money at home on the Internet. NO PORN ALLOWED!

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-24-2011, 12:25 PM   #1
zelil711686
Captain
 
Join Date: Mar 2011
Posts: 581
zelil711686 is on a distinguished road
Default timberland ladies boots Fukushima nuclear power pl

3 staff in the field of radiation repair operations have been an accident, two of them sent to hospital for treatment. Injuries and the effects of radiation, has the Japanese government began to consider whether to further expand the scope of the withdrawal of nuclear power plants around.


Tokyo Electric Power Company under the provisions of the staff when operating a radiation limit of 150 mSv. This is also the second nuclear accident has been reported in Japan for the first time field workers suffered more than this limit of radiation.
nuclear safety, security, according to hospital described the accident occurred at 24 noon, at Unit 3 of 3 people are in the turbine room set up cables. After the accident, this part of the repair work was interrupted.

The first nuclear power plant in Fukushima
23 Chubu Electric Power announced that, given the current public attitude towards nuclear power which has been shaken from the nuclear accident, the company has decided to start in 2015 the original plan to build nuclear power plant No. 6,台式卤猪脚, Bin Gang unit projects postponed to 2016.
repair work is constantly being smoke despite the Previously, units 3 and 4, the lighting system has been partially restored. This helps to speed up repair work. Because once the master control room back into use, the staff can be more targeted measures to further stabilize the situation of damaged units.
Japan's Chief Cabinet Secretary Yukio Ueno branch in the afternoon press conference that his understanding of the situation is that three staff members with higher levels of radioactive material when subjected to excessive radiation in water operations. He also said that other staff members hope to further pay attention to safety,timberland ladies boots, not to a similar situation.
another troubled part of the staff of the problem is changing the temperature unit. NHK television on the morning of a helicopter shot from 30 km to the nuclear power plant 1, 2,christian louboutin red shoes, 3 and 4 units of white smoke emerge suspected water vapor, which Unit 1 is a chemical factory explosion emerged after the first white smoke.

the accident occurred,louis vuitton men Qantas announced that two Airbus A380 aircraft to resume servi, the public safety of nuclear power generation also had a lot of doubts, which the Japanese operator of nuclear power-related projects have delayed, after following the Chubu Electric Power, Kyushu Electric Power Company is also not going to restart the day announced that their respective nuclear power plant in Genkai Unit 2 and 3. Genkai Nuclear Power Station located in Saga, Japan, the two units have ceased operation after receiving maintenance.

3 Unit Black smoke was still 23 pm, local time at 5:00 on the 24th until the smoke was cleared about reasons are still unknown.

Kyushu Electric Power Company said that the first nuclear power plant in Fukushima was still in an unstable state, the government is also being re-examine the safety standards of nuclear power plants, the company also need to have a more clear when the Government until after the policy orientation These two units began operating again.

Prior to that, nuclear power plant site has two staff members were injured in the next electrical job, but they are not subjected to excessive radiation.



Fukushima first nuclear plant leaks radioactive material after the accident,jordan wrestling shoes, the Japanese government has announced that nuclear power plants around the evacuation of residents within 20 km and 20-30 km range required residents to stay indoors. However,nike hyperdunk 朱�基的简历看过之后咋令人震动?, with increasing the scope of nuclear radiation,nike air max plus, the public began to question the scope of this evacuation is not enough. Evacuation of the U.S. government had declared nuclear power plant accident within 80 km around the U.S. residents and military personnel.

this end, Chief Cabinet Secretary of Japan Yukio Ueno branch in a press conference that day, the crisis continues,kids jeans, the Japanese government is exploring whether to evacuate residents within 30 kilometers.
Japan Atomic Energy Safety Security Institute, said the afternoon of 24 May, the first nuclear power plant in Fukushima carried out repair work for Unit 3 of 3 staff members suffered excessive radiation. 3 people suffered radiation in the 170 mSv to 180 mSv between. Two of them were attached to the leg skin of radioactive material, but the injury is not clear, need hospital treatment.
zelil711686 is offline   Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 10:33 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum