Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 05-21-2011, 12:34 PM   #1
nishi173
 
Posts: n/a
Default Buy Windows 7 Enterprise See below for real title

Due to technical formatting limitations and my lame desire to try and be clever the real title of this post is:
Be the Change Tracking You Want to See in the World
Anyway…
Change Tracking, a.k.a. Track Changes, a.k.a. redlining, a.k.a. the button I press when I want to keep track of who is doing what. Most of us have used it. Many of us love it. Some of us don't like it. But I don't think any of us know about all of the nifty things it can do and/or why you'd want to do these nifty things.
Enter the next few posts from yours truly. Specifically,Office 2010 Sale, here's what I'd like to cover in the next few posts:
The what and why of basic change tracking

The what and why of the various change tracking views/filters

The what and why of customization of what is tracked and how it is tracked

We'll cover the first in this post, and the later two in future posts.
The what and why of basic change tracking
Change tracking is the Word feature that tracks all changes made to a document. Specifically, all changes made to a document while you track changes are:
Marked-up à By default, new content (insertions) are underlined,Office Professional Plus 2007, content that is removed (deletions) are struck though, content that is cut and pasted or dragged within the document (moves) are double-underlined, and content whose look is changed (formatted) is flagged with a balloon. By default, insertions and deletions are also colored red and moves are colored green (this can be changed but we'll cover that in a later post). Finally,Microsoft Office Standard 2010 Key, a change indicator is shown next to lines that contain changes

Attributed to the user who made them à While you track changes, all insertions, deletions, and moves are tagged with the user name you specify the first time you run Word or set in the Word options dialog.

Can be navigated à The handy Previous and Next commands on the Changes chunk of the Review tab allow you to jump from one change to the next like this: Start
Click Next
Click Next
Can be accepted or rejected à Usually you don't want your document to stay marked up with change tracking. What you want is to see each change, think about whether you want to "accept" it or "reject" it, and actually accept it or reject it.
As you may have guessed, actually accepting or rejecting tracked changes is done by using the Accept and Reject buttons on the Changes chunk of the Review tab. Accept and Reject work like this:

Accept
(I like this…)

Reject
(I do not like this…)

Insertion
(addition of new content)

Intent: I want this new content to be part of the document.
Action: I accept the insertion.
Result: Mark-up cleared,Buy Windows 7 Enterprise, author removed,Office 2010 Home And Business Product Key, and content integrated into the document

Intent: I do not want this new content to be part of the document.
Action: I reject the insertion.
Result: Content removed from the document

Deletion
(removal of pre-existing content)

Intent: I do not want this pre-existing content to be part of the document anymore.
Action: I accept the deletion.
Result: Content removed from the document.

Intent: I want this pre-existing content to be part of the document.
Action: I reject the deletion.
Result: Mark-up cleared, author removed, and content reintegrated into the document

Move (relocation of pre-existing content)

Intent: I want this pre-existing content to be moved to the proposed location.
Action: I accept the move.
Result: Mark-up cleared, author removed, and content integrated into the document at the new location

Intent: I want this pre-existing content to remain in its original location.
Action: I reject the move.
Result: Mark-up cleared, author removed, and content reintegrated into the document at its original location
It's important to note that the only ways to get rid of Tracked Changes are to Accept or Reject them, to delete them like anything else (i.e. select the change and press delete), or to run the Comments, Revisions, Versions, and Annotations Document Inspector—which Accepts all the changes). That's it. Turning off change tracking or changing views does not get rid of tracked changes. The former stops new changes from being tracked and the latter simply hides them.

That's the basics of change tracking. More to come…
-Jonathan
<div
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 01:35 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum