Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Miscellaneous Forums

Miscellaneous Forums This is a list of any forum that has a free advertising section but doesnt fit into the categories above.

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-20-2011, 07:45 PM   #1
S4h1o9s4r
 
Posts: n/a
Default 200 elaboration tips ( marital , nomaritaled have

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.

2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a couple of level switch with a plug fitting. To off to cordless, pull the plug hazardous

3, above the brick chapter of the manipulation of sun angle, the last thinking is apt look by the workers class. If the level of nice laborers, plasterers, and better tools because grinding ceramic tile, they ought not hesitate to select the train of grinding a 45 degree angle. In effect, at all times a good grinding, grinding angle of 45 degrees in the affirmative approximate is the most beautiful! If the level of the personnel do many, then you still select to be positive angle, because the bad grinding angle of 45 degrees angle of approximate is not for yang effect of treatise.

4, line up the pipes after the water oppression test is also very important. Test, we must be present, and the test for at fewest 30 minutes or more, conditions permit, rather an hour. 10 kg of oppression, without anybody decrement before the final test.

5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat achieve, so not only beautiful, and good health to do.

6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the following ground (the ground side of the door both side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the nail has been package to the ground, with cement when the future, if the cement and Door tainted, moldy water will cause wood Door

7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated iron above, ah, ah naught like paint, easy to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal approval into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!

14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the bathroom shower section. A shower curtain can not drag the easy way erroneous, real inconvenient, water everywhere.

18, do door and frame materials to choose fine grained materials.

19, before installing the cabinets must be sure your home water is OKAY.

20, kitchen floor tiles will not pick white.


21, ceiling, pay special attention to smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy things that need to be installed as the installation requirements of dealers, it does not include installation, it must adhere to only pay the full paragraph after the installation! !

24, the renovation period, before you gather from business card contractors carry

25, Lvkou Ban the protective film is best cleared before installation.

26, shoe is best to use curtain doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient restaurant exhaust flare can also be safe, so when you eat hot pot or do not dirty barbecue houses the Office of the ceiling.

29, the door is best to arrange a location debris in the cabinet, can be placed on top of boot. The mutual things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is handy.
30, there is no need to use your ceiling, if necessary too anxious about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a guest, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily inconsistent.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely soil.
4, staring at himself in the scene, closing side is very important, do not let them lax, or leave a black suture, how to look how ugly.

31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.

32, nevertheless taking into account the custom-made cabinets look good, but not durable, comprehensive outlooks of some of my classmates online and experience, to counter the structure of using cement to do, inside and outdoor the sides mallet tiles, marble countertop mart, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent variant few. Read a good many of his neighbors mention, I did not blow.

33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, approved 2-3 road on it. Pihui allowed when a gray slick once, and then brush the handbook, sanding again, after brushing, and eventually twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon achievement of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorize Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing container board. I am terrified that is insufficient to buy. Backplane is relatively thick, buying is thin.

34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can attached in the future some workers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see everything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the torrent damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management office to clear, wake a lot of small muck.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.

35, a wall of long, lofty. Such as a bathroom with 4 walls, each wall should measure out of its long, high. And then deduct one of the skylights and doors of the district. Finally, a numerical ground district. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom roof light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.

37, the socket must be considered a good situation, height, interval. Even first met playing iron cassette position, the latter is found to just be put away the journal TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and finally found not only ergonomic elevation, but also can not buy a good fit stainless iron cabinet legs, can only be made of aluminum foot.

38, just around the turn in the hallway of the tube with a good, sunny and have that effect.

39, did not take into account when loading the table lamp nestle,Lacoste Carnaby Trainers, it lights not in the middle of the table.

40, bathroom tiles do not use too much pigment, 1 easily nasty, and second, a long time, too dull!


41, outlet to more equipment, furniture to buy outside the ground to sand security to consider, like to see more housing, in principle, should cling to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.

43, the color of brick is hard to find satisfactory, and I did not find, although, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.

44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation bubble board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.

46, bathroom cabinets with stainless steel legs are mammoth profits to find some local stores to buy back price of mad cheap.

47, install the lock lock head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.

48, Paco the floor well, I like to prompt that the only directly to the boss about the price and the salesperson talk about than the price better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original remuneration will want to save the old junction box outside use, electrical propositions put new ones in the room, and now thathe suggested this expensive.

52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE inquiry headquarters phone number and called to ask the local branch number.

53, the crowd delicate jugs jugs than on stage, agreeable, good washing. Basin mixer with the audience to pay care, taking into list the basin corner thickness, guiding to longer jaws.

54, without any modification of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter apparently put forward. angle Ding Jiaoxian do help to play the straight line.

55, online slots before the cement surface, surface treatment ratified putty is very important, for no solid surface with a clean ball treatment is very appropriate.

56, make plaster appropriate for a large hole on the walls, of way, if the cavity is too huge or need to use cement.

57, frosted glass on the back do not coated with paint to protect the hard to clean!

58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.

59, the price of elegance auto racks too much water, and base a number of relatively nameless brand in the structural design on the front line preferably than the brand, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to popup up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to discourage hanging back and forth when moving wires)


61, warehouse room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.

62, starting bed frame (which is so called up.) I am a vocational company to buy the cloth-bed bed, and spent 350 yuan added such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!

63, namely not practical twice bar towel rack! Like the present and uses a single rod, hanging wand base membrane will no look inside and then drying towels

64, inside the cupboard that the litter is insufficient practical, than on the outside. There do not install the door panel of the trash binary and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, to I think the mop bucket less demanding in terms of rendition, one can assemble themselves out of covered and the circling environment that is consistent with tile or mosaic appearance, and money.

67, the lavatory tin point fasten nail to hang someone in the hook.

68, designed a bathroom cupboard put clothes, no longer have to fret about bathing forgot to clean clothes.

69, washing machines with drying is not serious and practical, in addition to one year, only the yellow mold-day, and the evil mammoth. Thick raiment, towels or drying discontinue, let the sun purchaser disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundromat chamber to do a laundry tub, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is actually convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, and now do not have much accident of opening spot.

72, the biggest lesson studied is that in fact the simpler the better fitting, less pollution, less money, truce of mind.

73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.

74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...

75, Bath and Kitchen layer tiles stick better after a good amount of what the sometime did not do the level of the lowest point is not looking at the floor drain, or other groups did and decoration after passing, a lot of die cells.

76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use perspicuous glass, shower in it will not seem so cramped.

78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly death. The results they have bought their own hook pointing agent, that tired

79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the meat in the above, agreed to give me almost two months have not installed installed (only to polished once).
80, do not confuse the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to primp like home improvement.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework instantly. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have idle money in the shower head, and marvel how the aggregate now relief.

83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack comparative position.

84, bought the mirror to consider the situation of mirror front lamps, and if do not absence to setup a short-lived mirror front lamps, mirrors the size of the cover for the mirror to be competent to set alongside the line of the best light.

85, put washing on the terrace to be a small cabinet, effortless to put some debris, such as washing abrasive within the debris. Both beautiful and practical

86, must be staring at the upstairs upstairs to do down the dropping water .... otherwise, get the wall cabinet, the wall is a muff ....

87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the bargain.

88, TV background will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, for example, the left or right pots pots, water and drainage that is situated in what place. Otherwise, changing for the better after the finding phase of the wash basin was not fit!

90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or saw him cut his cloth.

91, the decoration of the construction process:
(1) approach, damaging down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task.)
(3) mowing trough, water, electricity transformation and acceptance.
(4) sealed underground water hidden trough renovation project without closing the water leakage test began waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (food vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood neat plate, pasted, fine line creation and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door latch installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preparatory acceptance within the company.
(20) three prim acceptance of appointment, distribution owners.

92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the most, otherwise it will affect the effect of cigarette hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cable to see part of it, leaving a trace of regret.

95, to individually measure and record all the available house sizes, size chart will be covered 楼书 units and then re-wire tagging, the final size will directly influence the interior design and furniture purchases.

96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to adjust actual or attached their own ideas, of course, be both the best

97, began looking for decorators. To personal experience is cared, if I were you particularly large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have peruse and coincide to the eyes, especially the feeling of the human in charge of the decoration is more important, liability and gratitude of how, some of the former is more critical, because if necessary a stripped-down, in fact, those who live almost on the outside will do merge, but the quality is good or bad may depend on a sense of liability.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the running around on the weary, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their lusted style filter out the right things slowly. Some people take good style, when others grasp of color standards, it does not matter, anyway,Womens Lacoste Arin Trainers, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly accept the unavoidable and not very much.

99, has been bullish on the furniture is best to size down, and then to display the future situation of the virtual room.

100, the necessary documents to buy something good must be maintained, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the cache receipts, leaflets, etc., because a lot of things have a warranty duration, the certify lost would be more trouble.


101, during the construction projects are sure to mushroom alternatively diminish the price they inquired for and then jot it in dark and pearly.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.

103, as much as likely to communicate with construction workers, to decide whether he understands your directions. Put ourselves in each adore the work of the main, esteem him, and human feel the magnitude of home, and began to live to whether it is extra responsible for some of it? Saying goes, is not shrieked (But if you face a treacherous cunning tease, who, it would must revenge, argue) in particular to some marginal projects is the need for co-ordination of several trades, the workers will be responsible to every additional and coordinate their relative duties, Otherwise, we pass the buck back and along, entire pass the buck. Like my mason to help me solve some carpentry entity, and electrical and determined some masonry problems. Because each teacher's experience is assorted, by the time he is compliant to help you detect a way.

104, do not do the best furniture fixed, because it no longer may be some alterations in the layout. If we do have to grab the quality, or endless distress.

105, be sure to change the water carefully, one dictate of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

106, according to their tangible needs rational preparations wiring, so as not to waste (especially the napkin with a lot of lights and lighting if only practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to often; well inside or underneath if the shoe has a socket is good, can bake shoe apparatus, I now regret not quite this wire cloth.

107, the bathroom as rainy and dry area, if area is small with a base favor (special glass basin was dirty, slothful with remind); conditionally set a waterproof cabinet incorporating small debris is best, put everything naturally does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to experienced painters talk.)

109, the cabinet must be cautiously chosen, compared to more than a few quality, we go to do a solid tight, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are restricted, basket, basket seasoning, rice pail of what you can do all of these components in the cabinets sell the company in general is very expensive.

110, wardrobe rather more not less, rather big not small, the women remember! Dangling from the longest space to be able to dress down.

111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.

112, curtains, furniture, family utensils in the whole approach is best and then made to match the overall neatness tone. However, before cleaning can track installed.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a symbol of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installation time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

115, furniture installation is best looked at in the next, especially as the closet of the laminates are several holes on the alternative, I was not looking at the results of the small distance between the laminates, hang clothes extend not open, even after the adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.

117, installation of combustible gas, booking gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily accompanied to the surface of wood products Wood, feels a tingling sensibility, although this can be higher label and then brush repeatedly sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not emerge repeatedly after the dust brush addition on the surface of the wood products. All that creature said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to melodrama a lot of discounts, it has been appointed Wu regret things. And I buy in the organization hi the process of addition paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the rule of same reason, so here to remind students to pay attention to it.

119, on the fill paint: painting pedagogue pay is waiting another batch of finished dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, smeared the walls, the decoration is to determine the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a junket (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the period. If the fear of affecting the duration of the case, but also the impact of the air to reduce dust, then point to a lot of sedulous to clean the room, the health of the.

120, decoration team choice: As the first company selected the guerrillas or the normal, I muse is not important, the opener is to give you the pate of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, a crowd ofis this, if your time is very wealthy, it is another material. And decoration companies to talk about this before, must be clear that you must do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the manifold factors and decide what the afterward items you want to outsource , which items to embroider the company to do.
the decoration of the people, the decoration of the attempt as cheap as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to assure. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an craft to.


121, the construction? As I am not eager to stay, it plans to look for fortuitous workers: your neighbors a good home builders are promising to chance the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by tread step by step, I believe, working slowly and deliberately.

122, to use every cent wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to resist . A short period of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in disarray, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is miscellaneous.
My view is:
one pre-determined price, after the referendum materials.
excess of the expected cost of 10 percent-of material merchandise, do not garbage period. Business is all fine too buyers. I am doing a detailed timetable of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the bloom to flower.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problems is the transformation of the place, kitchen and toilet water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square measure of ordinary furniture.

124, covert project was not to save money the most essential place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per meter circuit,New Lacoste Trainers High Top, with 6 months warranty. Details of B & Q on the first floor in the eastern of the individual services and pricing announced, we do reference

125, the most hassle free way is to use online resources, the accumulation, retention, arranging integration, will certainly be serviceable when.

126, in order to save time, enhance efficiency, each has a acquire on the decoration materials market, a detailed and practical procurement schedule and budget is very important.
list by room category procurement plan is easier to implement: each took to the avenues to see things the same room, to facilitate approximation and comprehensive
together, threaten to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, study projects
VII, the main Health Project
8, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: data in the table as one example. This account is used as a acquisition plan
more convenient, the corresponding project before construction can be re-classified along to types of merger, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (cream paint 3 batches of 3 brush; shoe plate by Albert, brush polyurethane varnish) and so on.

127, home cinema rear spokesmen, the sound cables to be embedded in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, restroom, kitchen need backdrop music, audio and audio cables embedded before the renovation.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of wet and dry on the wet area floor drain better
2: If you are burning normal gas water heater attention to the bathroom to have adequate airing to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a prevaricate.
11: hydropower is still looking for professionals to help themselves because the features in this context also advise the design of their own lives who absence to be became in the transformation of migration, but if there are problems while the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should rely on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest insistent that when you do bad, but because the waterproof design problems in the choice of size If you meet after the designers got the fancy that he would not cut off the bricks to fill the ground so that you broke the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without being devastated
19 when the composition is immediately bought ready-made cabinets are the most instantly is because the family The water issues need to be near to create the design, of course designers in addition to circuit design but also inform the designers set their own homes who are constantly under the kitchen cabinets so the scale to better determine your cooking at home more cozy to use sheet metal cabinet recommended to choose such a large load to bear secure



tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little morsel better and not dry the glue to the wall. Also, cabinet hinges, the pond water, switch and so use the good, the cabinet material,Lacoste Gravitate Trainers, pool compartment body, needles can be used in general, of course, if you will not attention almost the money.
large package if not, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black daytime home, save the dark.


132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction troops on the water to minute test, before they are allowed to change treatment.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circumference to be buried in the black wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it double, more than 30 cm can do it again, mantle need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the drip is the


134, tile
(a) the employers is necessitated in the culling of tile for tile quality finds its way: first, to discern its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the criteria of its size, the quantity of tiles with a tape meter the width and length, fathom out the size of the factory size to be consistent with its trademark, the crooked and then the amount of the tile,Lacoste Swerve Keyline Trainers, such as the crooked line, then the tiles is positive; then look at the flatness of the tiles, the most uncomplicated and telling means is to tile the same mark of two overlapping positive and negative, such as overlap significantly later the gap among two pieces of tile or you can turn the tiles irregular; last look There is no color tiles, the means is to take out a few examples of the same type of tile, in the light are likened, such as do not see the color difference can be mandated.
(b) After the tiles stick can not have a whole piece of brick hollowing (regional hollowing whole piece of brick can not surpass 20 percent sign), if the needs of the entire membrane Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are granted to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the detriment within) from them, such as Over this scope, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of mistake tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be smooth on the corner (allowed misdeed of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan essential after the


135, anti-termite
(a) punt down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the entire house that drugs)
(b ) After the entry of all plates in need of anti-termite treatment (specifically made for wood termite classification)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is accepted (you can clearly see the wet)


136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to send a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for bargain, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them meager quality, easy to change color or mold the future.


138, if it were not for a last resort, do not use toilet seat shifter. This material is very threaten to cause clogging toilet bowl water.


139, Lvkou Ban kitchen, two above the hood, open the holes we must await a good hood completely up security after installed. An early and I go home, and afterward removed to install hood Shiyou, individually and put them all out of shape by workers, seamless ceiling has become a ceiling joints.


140, if the intention of uniform outward, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground cup joints where paste. I do not have time for processing, water workers are not scrupulous, a lot of water splashed on the ground infiltration to the door border, the retinue part of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had ready a bucket of wall paint, activate yourself on a regular foundation ... ...


142, sealed in the wall of water reform must allow the decoration to cater detailed master water map.


143, if the paint color for the walls, in the power needful to take into account the time for transformation of the line problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future livelihood. Later, brushing the wall paint color, etc. only to find how these white glare, apologize ah ~~~~~


144, which is the lowest level I made a blunder, I assumed that 1.5 m bed width is 1.5 meters, forget the thickness of the mattress there. Very accurately in bedside closet to linger well backward the lamp socket on the wall. As a result, there is no course to stop the channel accustomed to be.


145, started before the captain to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line must be re-wiring. But the final from the nearest branch wiring. The increase is not allowed in the elemental wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of tel and network cable, when the original cloth of the line can be drawn to persist to use. However, if the unsuitable construction there will be many hidden perils. So the best room of the weak from the carton to be replaced.


149, calculation circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half comprised in the overhead lines.)
(2) overhead line (dressing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even now the number of replaced (replaced the line to narrate the construction team do not discard).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.


150, how the toilet fixed to the floor, hit the screw with it? There is assembly at the base and pipeline,Lacoste Tourelle Trainers, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally bought with a special sealant.



151, buy materials, we must first calculate your near method. To buy water when the material to do anyhow, after meditative about a painting materials by sea blueprint in the end how many came out, so little believe in a hurry the boss, the result was that buy water 5 meters, the actual use 27 bronze published months, actually bought a 40, should the remaining 13, 7 short of the actual remaining 6. Under repeated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, web cable from 20 meters to 13 meters, other such as insulating tape, plug had magnificent way was I correct ... ...


152, whether there are age water pipes under the floor, in addition to switch hit, it tends to be marred, do not hesitate to be the arranging of new, do not retention, to ensure safety .


153, bathroom walls that retraction of the mitten do not waste space, and posted a very good very nice tile. Of course, that tile alignment trouble saying


154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and lax some of good thing.


156, the bathroom floor if higher than the hall, the transition can be used to solve the door stone.


157, plus migrate the sewer pipe mouth, then the new and old sewer pipes should be retarded before the entry of the old sewer butt is flat, this time a lot of money to clear the bit to dodge future trouble.


158, Lvkou Ban did not need to buy high-price, quite low Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.


160, the color of brick is hard to find satisfactory, and I did not find, but the two kinds of color are not satisfied with a staggered mosaic sub can approach 45 degrees but I am very satisfied with the results. This is naturally the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water repellent to use is not in consensus with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not bother but insured.


162, the slope of the bathroom floor before tiling to consider the good, the tilt is not in accordance with citizen standard to achieve the effect of quick drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and beautiful, I think it is nonsense. Instead larger slope water to quickly sprint a very clean and is very comfortable thing.


163, the LG door with platinum point bombard board, the effect is good, but might consider if we made the decoration ended door. The door by hand is not cultivated, for reference only.


164, sink big market brand-name price is not cheap, brand-name quality crazy bad.


165, the balcony door is best to use the same type of fire board. Balcony surroundings is harsher.


166, bathroom vanities and cabinets to do when they must think the size of basin lest good fit in the future.


167, the glass is massive stuff, the best buy in the neighborhood, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.


169, matte paint is high and light is beautiful, do not hear to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and as long ashe suggested this valuable. On the interior door is not bad, it really easy to use!


173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao stopper kept it up elsewhere.


178, buy silicone, then the perfect best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 factor that can also be used, such as aluminum window frames with interior Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, worth for money!


179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if necessary installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.


180, even in the journal has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, general decoration, decoration companies, excluding the formal management fares, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home promotion to a time bombard, who say where Shashi Hou himself in trouble.


185, if the separate tube wear, but in a tank of great? Effects can endure


186, ask what the cafeteria and living room are separated between the most cost-effective package Door, side pack only 6 cm, or contaminated with white, height 2 m, was not large High raw.


187, mighty and feeble power convey to each tube, to separate the best way, reserve the distance of 10 cm or more, but it can be tough, because most families in order to save prices and to open a slot. Weak audio line can perforate the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In truth, you are using a good wood core board, do not deal with furniture inside.


189, the cabinet can be 15 cm plates and wood core board, the back of the 5 available folders, Wuli. Package doors and Tizi use nine per penny. Different materials with different techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed oppression test, no leakage. PPR pipe and will not scale. PPR pipe scale not known, not oxidize, never leakage, green high water material.


191, paint board is good, the conveniences of either wood and composite.


192, do not print for a long time on the wet synthetic stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel pellet, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please note, we must verify the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.


195, the size of certain blueprinted sanitary ware, the best sketch in advance, think the size.


196, students pay attention to the door to buy products, if you want to chase results support the panel with the commerce package Door, then you may have to be Henzai sword it!


197, Re: installation of water pipes are put before the governor and basin, sink have bought?
not, fair determine where is the basin faucet, bathtub faucet, cleaning machine what's on the line leading, leading 99 percent sign and fell into the water are in line with worldwide norms, by the time workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size elements, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between peppery and chilly water pipes with cement tiles have to be exact ahead the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable in the meantime take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the semaphore will cause some program-controlled switches on the network whistle interference in the home environment generally will not have any problem. But rest assured that I can recommend such a path will leave apart to the margin, the network cable is very cheap that you say?


199, be sure to check the delivery box installed properly.


200, fitted bath and shower faucet lessons joined to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to simulate not in due time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the coerce feeding. Yesterday discovered that my fb leading high temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 12:28 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum