First,
Cheap Gucci Trainers, the amount of ordinary residential architectures of concrete and steel weight :
1,
Gucci Shoes Sale, multi-storey masonry house :
reinforced cement 0.3-0.33m3/m2
2 30KG/m2
, Multi- frame
reinforced concrete 38-42KG/m2
0.33-0.35m3/m2
3, 11-12 high-rise concrete layer
reinforced 50-52KG/m2
0.35m3 / m2
4, 17-18 senior 54-60KG/m2
reinforced concrete layer
0.36m3/m2
5, 30-story high-level H = 94米
reinforced 65-75KG/m2
Concrete 0.42-0.47m3/m2
6, 28-story high-rise suites
H = 90米65-70KG/m2
reinforced concrete 0.38-0.42m3/m2
7, villa concrete Between consumption and the measure of iron and high-level multi-storey masonry house more than 11-12 layers of data among the
7 degree earthquake region rules at devise
Second, ordinary multi-storey residential creating construction ration economy arrows
1 , outdoor skylights (not including compartment gate, security door ) area of the floor area of 0.20-0.24
2,
Mens Gucci Moccasins, absolute construction area of the template area of about 2.2
3, the outdoor space of the layer space of plaster about 0.4
4 , Interior plaster total construction area of 3.8
area of the three , the construction efficiency
1, a plaster plaster work day in the 35 square meters
2,
Womens Gucci Pumps, a red brick brickwork 1000-1800 stop mystery
day 3 , a hollow brick brickwork 800-1000 day puzzle chips
4, tile 15 square meters
5, 300 square meters of first pass scraping pearly / day , and the second over 180 square meters / day, the third period calendar of 90 square meters / Days
four basic data
1,
Mens Gucci Sneakers, concrete weight 2500KG/m3
2, the weight of steel per meter 0.00617 * d * d
3,
Gucci Shoes UK, dry dirt weight 1500KG/m3, wet sand weight 1700KG / m3
4, stone weight 2200KG/m3
5, approximately an cubic measure of red brick 525 (min thickness of the walls )
6, one cubic meter of about 175 hollow brick
7, one neat and sand sieve Ordinary sand apt be 1.3 square