First, the measure of ordinary residential buildings of concrete and steel weight :
1, multi-storey masonry house :
30KG/m2
reinforced concrete 0.3-0.33m3/m2
2, multi- structure
Reinforced Concrete 38-42KG/m2
0.33-0.35m3/m2
3, 11-12 high-rise cement floor
reinforced 50-52KG/m2
0.35m3/m2
4,
GHD IV Mini Straighteners, 17-18
altitude layer of concrete reinforced 54-60KG/m2
0.36m3/m2
5, 30-story high-level H = 94米
strengthened concrete 0.42-0.47 65-75KG/m2
m3/m2
6, 28-story high-rise dormitories
H = 90米65-70KG/m2
reinforced concrete 0.38-0.42m3/m2
7, the amount of concrete and steel volume villas intervened In multi-storey residential and high-level masonry
11-12 layer 7 degrees upon the seismic zone file along to rules of structural devise
Second, mediocre multi-storey residential creating construction ration economic indicators
1, outdoor doors and windows (not Including the compartment gate, security gate ) area of the floor area of 0.20-0.24
2, absolute construction zone of 2.2 template district nigh
3, the outside area of the floor area of plaster approximately 0.4
4, the indoor area of the plaster Construction area of 3.8
Third, the construction efficiency
1,
GHD IV Pink Straighteners, a plaster plaster work day in the 35 square meters
2, a red brick brickwork 1000-1800 day mystery chips
3, a day brickwork 800-1000 hollow brick puzzle pieces
4, tile 15 square meters
5, 300 square meters of 1st pass scraping pearly / day , and the second over 180 square meters / day, the third period almanac of 90 square meters / day
IV Basic data
1, concrete weight 2500KG/m3
2,
GHD Purple Gift Set, the weight of iron per meter 0.00617 * d * d
3, dry dirt heaviness 1500KG/m3,
GHD Carry Case & Heat Mat, wet sand weight 1700KG/m3
4, Stone weight 2200KG/m3
5,
GHD Green Butterfly 2011, about one cubic meter of red brick 525 (min thickness of the wall )
6, one cubic meter of about 175 hollow brick
7,
GHD Straighteners, shade wash sand apt be 1.3 square 1 ordinary sand