Mu- ha high-speed solar control
the exact position of the 1st toll station in Mudanjiang
begin to zero km :
a 2.8 km ------ solar monitoring
II ,
GHD IV Pink Straighteners, 24.7 km --- ; solar monitoring
III , 25.4 km ----- Rod monitoring
4 , 53.8 km ----- solar control
5 ,
GHD Purple Butterfly 2011, 68.8 km ----- solar Monitoring
6 , 96.7 km ----- solar control
7 ---- 106.5 km at solar control (right sided )
VIII ,
GHD Green Straighteners, 134 km ---- Solar control
nine ,
GHD MK4 Kiss Straighteners, 134.1 km at the bridge monitoring
---- ten , 175.6 km by the bridge monitoring
---- XI ---- 177.1 km at the solar monitor (left one Side )
second , 195.1 km at the solar control
---- XIII ---- 218 .. 4 kilometers of solar monitoring
XIV, 230.7 km at the solar control ----
fifth , 244.7 km at ---- Solar control (left sided )
XVI ---- 245.4 km at the solar control (right sided )
seventh , 266 Km ---- solar control
eighth , 266.1 km at the bridge monitoring
---- nineteenth ,
GHD Leopard Grain, 275.7 km at the solar control
---- Twenty ,
GHD IV Straighteners, a bridge monitoring forget Records .
These are one-way road apt Harbin Mudanjiang monitoring, have the chance to Harbin, Mudanjiang and then one-way partition of the control disc .