1, the section will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the navel position if so, how to tilt both brick, floor drain is not the lowest point.
2, bathroom, air-conditioning channels were not devised to switch. Especially the bathroom water heater, a couple of class switch with a plug fitting. To get cracking cordless, drag the plug risky
3, sun angle on tile part of the treatment, in the final analysis is to look at worker level. If the level of good workers, plasterers, tile tools and wear better, they should not hesitate to choose the train of grinding 45-degree angle. In effect, by the time a good grinding, grinding 45-degree approach angle of the sun angle is the most beautiful! If the level is indeed not very good worker, then you still choose to use positive angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.
4, line up the pipes after the water oppression test is also very important. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without any abatement before the final test.
5, when the iron gates iron doors must be thought a good size border protruding wall to inform the installer, making the final frame and had achieved the wall tiles are smooth, so not only smart, and good health to do.
6, woodworker and mason's Door package is to tie the tiling, including door pocket of time to consider the following ground (the ground side of the door either side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door
7, mattress below and must be breathable mattress. Bed board is generally best to use cedar board
8, do the paint as much as paper tape
9, buy a lamp to note: generally try to use glass, stainless steel, bronze or wood (shelf), and generally do not buy everything above iron What other plated coatings, ah, ah what kind of paint, easily fade.
10, consist in ... ceramic basin basin, glass basin downright Health
11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, a lot of construction in the verbal agreement into the breach checkout massacred, must be written in black and white, mushroom or reduce in costs of items are sure to ask, write it!
14, on the ground if mounted floor, the ground must re-do the cement layer to re-smooth.
15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the shower toilet partitions. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.
18, do door and door frame of the wood material to choose carefully the material.
19, before installing the cabinet must be sure your home's water is OKAY.
20, kitchen floor tiles will not pick white.
21, paying particular attention to the ceiling smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy the things you need to install those sellers will be required to install, it does not comprise installation, after installation, it must adhere completely to pay money! !
24, decoration, your previously collected business cards contractors carry
25, Lvkou Ban protective movie is best removed before installation.
26, the shoe is best to use shutter, anti-odor. You can leave a shoe outlet side, to plug bake shoes.
27, where the cooking can be a small security lights.
28, it is convenient restaurant exhaust fan can also be safe, so when you dine hot pot or do not polluted barbecue house auditorium ceiling.
29, the door is best placed to plan a debris of the cabinet, can be placed above the shoe. The common things, such as umbrellas, bags, scissors, coins, and so eat of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too anxious about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a tourist guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the web color, especially the kitchen dome, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his grasping mind, do not believe selling the vision of smallpox, their eyes Barbara soil.
4, staring at himself in the scene, while income is important, do not let them slack, or leave the black seam, how to look how ugly.
31, third day of the main hole and continue to paste tiles, scope hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be selected before the hood, stoves and water heaters, etc., to decide the hole size.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the structure of internal and outer sides of paste porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not blow.
33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, agreed 2-3 road on it. Pihui acknowledged when a gray polished once, and then paint brush after brushing but also polished, and finally twice with ICI paint brush, the whole wall look smooth and flat, really good. Upon completion of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, although there is no furniture store to buy so agreeable, but durable, quality should be better than buying. I am not terrified of standing container board. Buy probably will not work. Backplane is relatively thick, thin to buy that.
34, when other students in the tiling must note the following:
① best he can in the field.
② some of the less perfect tile can be attached to the future of some workers to see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist was attached to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ Be sure to drain plug with something good out of cement down to prevent clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, get up a lot of small muck.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very sorrowful, all sweat Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then deduct a window and door area. Finally, calculate the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.
36, the best is a two bedroom dome light control, and a door, a bed, a bed of winter save up and then turn off the lights.
37, the socket must be considered a good location, elevation, interval. Even 1st play situation having steel cassette, put away after a cassette is base just at TV cabinets, microwave, desk block, the first 2 had to move the location of furniture, high, and eventually base not only ergonomic height, but can not be bought a good fit stainless steel cabinet thighs, only customized aluminum feet.
38, just around the corner in the hallway like the one installed, that there are bright effect.
39, when mounted lights did not consider the placement of the table, the table now is not in the middle of light.
40, bathroom tiles do not use too much pigment, one easily dirty, and secondly, a long time too dull!
41, outlet to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to cling to.
42, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete specter.
43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.
44, playing in the balcony on the top cabinet on the back of the cabinet, then a layer of bubble board insulation with water works well. Balcony door is best to use the same type of fire board. Balcony environment is bad.
45, if not suitable molding may wish to order, custom-made quality also seems better than the specimen. More personalized and customized.
46, bathroom floor cabinets with stainless steel legs are colossal profits, the back of the store to find some place to buy cheap price mad.
47, install the door lock head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.
48, Paco floor well, I like only to remind the owner to talk directly to the price and the seller to talk about than the price better.
49, matte paint is high and the light beautiful
50, if the re-decoration will use putty instead of talc products.
51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the junction box with the old, electrician recommended on the interior ones, and He now found this valuable suggestions.
52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.
53, Under Counter Basin Above Counter Basin than slight, good, good clean. Basin faucet with the audience to disburse consideration to, catching into account the thickness of the basin corner, leading to the mouth longer.
54, without any modification of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put forward. Ding Jiaoxian angle helps to play a straight line.
55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball handling is very appropriate.
56,
Supra Trinity NS Shoes, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.
57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!
58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.
59, the price of elegance auto racks too much water,
Women's Supra Vaider Shoes, and found some of the more renowned brand is not on the structural design but better than the brands, prices are much lower.
60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, routinely flush with the ground, feet a foot on the socket can popup up. Suitable for large living room. Or security in the dining room table below, to insert pot (to prevent hanging back and ahead when moving wires)
61, storage room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty clothes cupboard.
62, beginning bed frame (the so phoned it). I am a professional company to buy the fabric bed, bed, and spent 350 yuan and a such a thing, end of the bed there is a pull deal, bed board will turn up, exposing the bottom of the cache space, Terrific Oh!
63, is not practical double-pole towel rack! Current and single-pole uses the same elementary look forside layer will not be hanging pole and then drying towel
64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the trash bin, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table next to the small cabinet, and can be placed on some stuff, very convenient.
66,
Kids' Supra TK Society, on I think the mop bucket less demanding in terms of representation, can convene one yourself out, covered with tiles and match the circling environment or the mosaic that is beautiful, and save money.
67, the bathroom can nail fasten point of hook to hang something.
68, designed a bathroom cupboard to put clothes, no longer must fret about bathing forgot to clean clothes.
69, suffered a severe practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the evil immense. Thick clothes, towels or drying quit, let the sun more than a good client disinfection. Even been amplified, you need to save the point of silver.
70, even in the laundry room to do a laundromat pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.
71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW visitors to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, now do not have much chance of opening spotlights.
72, maximum fitting experience is really as easy as feasible, fewer pollution, fewer money, truce of idea.
73, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing dishes and vegetables.
③ bathroom to wash your hair you can pull out the leader. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.
74, to buy their own toilet must be a good amount of pitch, or go buy a return that is truly ... ...
75, posted WeiChu tiles after a good amount of what did not dry before the best level to see the lowest point is not the place to drain, or other dry and then passing the buck and decoration team, a lot of dead cells.
76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling,
Supra Muska Skytop Shoes, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large enough size, and use perspicuous glass, so there does not seem cramped shower.
78, should not use white cement tiles pointing hook. No month into a black sew, ugly death. The results they have bought their own anchor pointing agency, that tired
79, artificial stone cabinet after the next board should pad the results found no installation, and now can not cut the meat in the above, have promised to give me equipment almost two months have not installed (only to polish a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real serviceable asset, the key is you want to simulate to look like home promotion.
81, if the floor drain installed the original developers have the kind of injury smell of the
82, attached bathroom floor tiles after a good test the water, if water is relatively slow quickly rework. Our household's water is relatively slow, then relented a morsel, now it is always a little bath water, and made hundreds of our main Guardian silver shower brain is lazy, it always marveling how to remedy.
83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack relating position.
84, to consider when buying a mirror the mirror front lamps, if you do not want to install a temporary mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights reserved.
85, put the washing on the balcony to be a small sideboard, simple to put some debris, such as washing abrasive among the debris. Both beautiful and practical
86, must be looking at doing upstairs upstairs leaking water .... otherwise, get a hanging cabinet, the wall is a shambles ....
87, do not blindly follow buy online, I later discovered that some of their own to buy cheaper than the sale.
88, television wall must set a few more outlets, television, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before the installation of a large sample of wash basin, case in point, the left or right pots pots, water and drainage that is located where. Otherwise,
Supra Cruizer Shoes, changing for the better after the finding phase of the wash basin is fit!
90, on the curtains, we had better put your stay a size goes, the foreman shows no less size. If less, then how come the. Or saw him cut his cloth.
91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this mission).
(3) cutting trough, water reform and acceptance.
(4) seal groove secluded underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packs Door, skylight cover. Making wooden cabinet frame.
(8) concurrent creation of wooden doors, door style and platen.
(9) wooden panel draw brush dust (food vegetable oil).
(10) window leveling laying cruel countertops.
(11) trim panel, pasted, fine line production and installation.
(12) wall of basic treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration prefatory acceptance within the company.
(20) three prim acceptance of appointment, allocation owners.
92, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the maximum, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do.
94, take the line in order to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of cable, leaving a track of regret.
95, the house in person to measure and disc the manifold sizes accessible, can be Broche size chart size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.
96, the small size of line is not good if the election is not always black walnut atmosphere, then the need for trade-offs, or to accommodate actual or devoted their own ideas, of course, the best do both
97, began looking for decorators. In terms of personal experience, if I were you especially large family and plan to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have read and coincide to the eyes, especially the sensibility of the human in charge of the decoration is even more important, liability and appreciation of how, some of the former is more fussy, because if not a stripped-down, in fact, those who live almost cheating the will to do, but the quality is good or bad may depend on a sense of liability.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running around on exhausted, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly according to their lusted style filter out the right things. Some people take a good style, some people have exact grip of color, it does not matter, anyhow, there is time to consider, if you await until cleared decoration, furniture, help wanted to see the treads and then reluctantly approved the unavoidable end will not really like it.
99, yet optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.
100, buy something necessary documents be sure to keep the move on the latter may exist back, a replacement is indeed useful. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a engagement time, evidence lost would be more trouble.
101, the process of construction projects are sure to increase or decrease the price they asked for and then write it in black and white.
102, check for the necessary construction of protective measures, such as entrance doors to use jewelry cotton wrap, window and floor tiling good must be properly protected.
103, as much as possible to communicate with construction workers, to determine whether he understands your purposes. Put themselves in respect of each teacher's work, respect, the importance of people feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning bully who, it would must revenge, debate) of special note to some of the edge of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their respective duties, Otherwise, we pass the buck back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, at a time he is willing to help you find a way.
104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do we must grasp the quality, or endless troubles.
105, be sure to change the water carefully, one costs money; second, if it were not for the ceiling from the floor must be laid down in water, if water problems big trouble.
106, along to their substantial absences and rational preparations as wiring, so as no to consume (principally the cloth with a lot of lights and lighting if necessary practical, we must also attempt to avert the sequence to use, garbage electricity), merely some locations tin not be Province, for instance, afterward to the bathroom mirror, and constantly with a hairdryer and razor; well inside or beneath if the boot has a socket is also agreeable, shoe appliance can singe, I am now very sorry that no fabric lines.
107, the bathroom as wet and dry area, if the area is small with a pedestal like (special glass basin was dirty, lazy remind); conditionally set a waterproof cabinet incorporating a small debris is best, put anything certainly does not look good on the outside.
108, wood glossy white paint brush than when the nitro-polyester good (this is to listen to experienced painters speak).
109, the cabinet must be selected cautiously, to look at several of the quality, we go to do a solid strong as this one are easily thousands of sea, but also narrated to the furnace and sink, etc., they still do not blindly ravenous cheap good. But best not to do in the cabinet table or inside the litter can; if there is restricted funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very priceless.
110, closet rather than not less, rather massive not small, women remember! Hanging space to be skillful to put up the clothes.
111, bad handling glass or mirrors in the vicinity of the best things to buy, or Be ready to transport methods.
112, curtains all the best in furniture, appliances and then customized reach to mate the overall neatness intonation. However, before cleaning the trace can be installed.
113, alteration the gas pipe is best done before tiling, or may abuse the walls. Best to let the gas corporation to draw a graph alternatively on the wall for an indicator, for the closet company to be required in the cabinet body beginnings.
114, cabinet installatiin season is longer, ranging from 4 to 5 hours, as numerous as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see through the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes elected, I was not looking at the results too small a distance between the layers, hanging clothes extend not open, even after adjustment.
116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture in all the open doors the emission of odor, but also buy a special spray to eradicate the smell of things to come.
117, installation of combustible gas, booking gas ignition.
118, brush lumber of the time: the best Puwan other room painted tile or lumber floors. If you have to brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily spliced to the wood surface, wood products, have spiked sense does it feel, which although can be higher label of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall effect will be discounted RBI hit. Room Puwan tiles and then brush, then the atmosphere of dust content empty of than the shop front, with almost no brush again after the dust attached to the wood surface of wood products. This is so because when they sprint into a small decoration Wu circumstance, I had determined to buy in Canada Wood had looked it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of repent Xiao Wu. And plus I like the union buy the paint process, the students also arose in this home. So here remind students to pay attention to it. I do not know if other wood circumstance, but according to the principle of same reason, so here remind students to pay attention to it.
119, on up painting: painting preceptor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a diversity of electrical switches. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to determine the paint department team to pay up painting again, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the chapter after brushing the wall paint, which is the remaining chapter of the paint used to make paint). Just note, do not let install lighting division to pay smeared walls, you can pay less to make a trip to the paint division (at least half a day), but also facilitate a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall clash. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior acceptance has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the duration. If the alarm of affecting the period of the case, but also in the air to reduce the effects of dust, then a lot of points to be diligent about cleaning the room of the health of the.
120, the decoration team selection: The first choice guerrillas or formal company, I think is not important, the key is to give you the head of the construction team is solemn and responsible, the decoration of the capabilities of workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part, so, if your time is very rich, it is variant matter. And decoration companies to speak about this before, must be clear that you must do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the following factors to decide which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as low as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to guarantee. Fitting so many, you want to single item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact, are of great accent.
121, the construction? Since I am in no hurry to move in, so plan to find casual workers: the neighbors a good home please artisan, may be I look in the object: a mason, a carpenter, a plumber, a painter. Design step by step step by step, I believe it slowly and deliberately.
122, to use every cent wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can resist . May be a short period of time necessary to purchase these things in place, the economic pressure is really big. Most people at this time is often in disarray, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined price, after the election materials.
excess of the anticipated price of 10 percent-of material merchandise, do not waste time. Business purchasers always fine too. I am doing a detailed schedule of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problem areas are transformed, kitchen water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter general furniture.
124, covert project was not the most important place to retention money: water perimeter transformation, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circuit is $ 20 for half a year warranty. B & Q on the first floor in the east of the detailed individual services and offer proclamation, we do reference
125,, the easiest way is to use online resources to collect, retain, finishing the integration, the future will be useful when .
126, in order to save time, amend efficiency, decoration materials on the market each have a harvest, a detailed and practical procurement schedule and allowance is important.
Program list by room category purchase is easier to implement: each took to the streets to see things the same room, to facilitate approximation and comprehensive
together, threaten to have success.
one hall project
Second, the living room project
Third, the canteen project
4 main bedroom project
five children
six housing projects, study projects
7 main Health Project
eight, nine passenger Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the retinue table, for reference: file in the table as an sample.
This list is more convenient for procurement arranging, pre-construction projects may be appropriate, by job re-classification of the combination, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be joined in the If (3 batches of three wall paint brush; shoe with Albert panel, brush polyurethane varnish), etc.
127, home theater rear spokesmen, the sound to be embedded wires in the living room below, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.
129, toilet, kitchen need backdrop music, sound audio wires embedded before the renovation.
130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.
1: the bathroom is divided into wet and dry district 2 wet zones of the floor drain on the better
2: If you burn natural gas water heater attention to the bathroom to have adequate air settings
3 - 4: If you do not know, then you can ask a professional friend to accompany the master now prevaricate more.
11: hydropower, or find professionals to aid themselves because the functions in this adore he is to inform those who design their own needs to be became in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their alternative to tile bathroom ground tile is a vocational waterproofing has to do this at time of purchase, but you can rest assured water to do well because of design problems in the choice of size If you encounter after the designers got the fancy he would not cut off the bricks to fill the floor so that you broke the elemental design of good waterproofing, floor tiles, floor tiles are of lesson so early you can find out, but not your home is to live for decades we need a long-term certify so you must pay attention to the design of the bricks in the sidewalk without being destroyed
19 when the medley is now bought ready-made cabinets are the most direct is because the family The water issues need to be close to establish the design, of course designers in counting to water designed to inform the designer must determine their own homes who are often below the kitchen cabinet so to better determine the scale so that when you cook at home more cozy with the cabinet panel recommended to prefer such a large load to bear safe
white cement tile grouts and method is not the same, but the masons are usually fraught with white cement tile grout filling method, so era, gone sealant, sealant, and a little bit better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pond water, so use a good switch, when the cabinet fabrics, pond cell body, bolt can be used in general, of course, if you will not attention about the money.
If not a big package, I suggest to buy establishing materials as many as possible to homes in the East, was home, B & Q and other places to buy can be returned. 131, at the entrance of the light switch, it is recommended to use sensor-based. Black day to go home, save the dingy.
132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are granted to change tubes.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)
133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it twice, extra than 30 cm can do it another, coat need water at the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most probable to
134, tile
(a) in the selection of tile owners of tile necessary for quality finds its way: first look at its color is uniform, non-variegated black blots and holes the line; followed depends on whether the criterion of its size, the amount of tiles with the tape weigh the width and width, meter the size of the trademarks to its factory the same size, then the amount of its diagonal tile, such as diagonal line, the tile is affirmative; then depends on the flatness of the tile, the most simple and efficient method is to tile the same mark of two overlapping positive and negative, such as two stacked significant gap between the tiles or you can turn the tiles irregular; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole chip of brick tile hollowing (partial hollowing the whole piece of brick can not exceed 20 percent), if the entire piece of brick hollowing be rectified, under customary circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the loss of) from them, such as Over this range, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of mistake of 2 mm is allowed, the gap be the same tiles, bricks and tiles ought be flat on the corner (allowed misdeed of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles ought be flat on the corner, the need to level degrees (allow 1 mm tolerance) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) and finish the wall after waste accumulation trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the narcotic is better (you can clearly see the wet)
136, the computer is also a design study, and now the calculator has multiple functions to set the decimal point, making calculating time will have different standards, so we need to bring a calculator yourself, there are now calculated on a compartment phone functions, but function is not necessarily good.
137, to prepare their own two good independent glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for sale, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them penniless quality, the future is easy to change color or moldy.
138, if only a final resort, do not use toilet seat shifter. This stuff is very likely to cause clogging toilet bowl water.
139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and clear the hood to install, disassemble dismantling equipment, workers are engaged in out of shape, has chance a seamless ceiling ceiling of the seam.
140, if in order to unify charm, kitchen and bathroom doors are installed, and that presently after installed in the door marked with ground glass joints where glue. I do not have time for the processing, water workers are not cautious, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.
141, must be tiled balcony! King terrace to angle approximately to shop, shop to live with the railing to the terrace with the high. My kin outlook balcony to balcony wall angle and the life is not paved, but to prepare a pail of appearance wall, they periodically reanimate ... ...
142, sealed in the wall before the water reform must allow the master to provide detailed decoration water chart.
143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~
144, which is the lowest level I made an error, I presume that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to stay well back of the wall socket. As a result, there is no socket to be blocking the way to use.
145, started before the skipper to make inquiry of the wall decoration how to deal with the need to spade out all the original powder. In particular, ready to paint the wall engineering companies outsourcing to students. My family is contracted out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to shovel out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad action. Finally had to brush the surface of a layer of paste Pihui 108.
146, increase the line will naturally be re-wiring. But from the nearest extremity branch wiring. The increase is not allowed in the original wire connector on the wiring.
147, air-conditioning control switch only in the power supply side. Added line on the road is not allowed.
148, change the location of phone and network lines, they can out of the original fabric of the line to continue to use. However, if the unsuitable construction there will be many hidden dangers. So it is best to box from the room for weak lines.
149, the transformation of the workload calculation circuit, generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more basis waterway, according to the number one half pipe the other half included in the overhead line).
(2) on the head of line (dressing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to how much even if the number of replaced (replaced the line to narrate the construction team do not throw).
(4) feeble transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will have to buy less wire prices.
150, firm the toilet to the floor, hit the screw with it? There is convergence at the pedestal and the pipe, to buy what were sealed and the outside is better: the toilet is fixed with the expansion screw. The interface between the base and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.
151, buy the materials themselves must first calculate the resemble amount. To buy water when the material to do the latter anyway, analytic about painting with the sea diagram in the end how much material came out, so what little trust the foreman, the result was found to buy water 5 meters, the actual use 27 copper published one, actually bought a 40, should the remaining 13, seven short of the actual remaining six. Under repeated answering from other sites back up boss Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the boss of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug both large way was I correct ... ...
152, if the old water pipes under the ground, in addition to the drip when the switch is often damaged, do not hesitate to be arranging a new, do not save, to assure safety .
153, the kind of retraction on the bathroom walls, the mitten do not waste space, and posted a very good very nice tile. Of course, tile articulation that difficulty to say
154, sun angle tile lines do not use the earnings side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers idle access to do things.
155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed strong, and lax some of the good thing.
156, hall bathroom on the ground if the percentage is high, the conversion can be used to solve the door stone.
157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been distant better than PVC, the more money I can not see significantly different results .
159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.
160, brick color is tough to detect satisfactory, I did not detect, but the two varieties of color are not satisfied with staggered mosaic sub 45-degree angle I was able to attain satisfactory results. This is absolutely the bricklayer himself put along good proposals.
161, under the supervision of the ground water offensive to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but assured.
162, the incline of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of fast drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I consider it is rubbish. On the opposed larger slope water to immediately run a clean is a very refreshing thing.
163, platinum-point doors launch with the LG panel, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not nice, for reference only.
164, sink a large mall brand-name price is not cheap, brand-name quality outrageous bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is bad.
166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good fit.
167, the cup is heavy stuff, the best buy in the vicinity, or Be prepared to transport means.
168, install the lock bolt head to pay attention to some wax, wax on and then breaking too late. If you do not cigarette, then also pay attention to the door handle to prevent wall damage.
169, matte paint is beautiful high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be wrong. Similarly, if a good painter, said polyester polyurethane is not deceive your
170, with insulating tape and raw materials do not buy in the store, large supermarket quality was many better, and full heaviness, transition down the price is not expensive.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that ended product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable suggestions. On the interior door is not ugly, it really easy to use!
173, large internal design company instantly to workers on site clearance go package may be more appropriate, and better technology, tools, more
174, and air leakage conservation switch to use the brand appoint. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone digit, and then played to ask the regional branch digit.
175, the audience delicate pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.
177, the hole before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up elsewhere custody 也好.
178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important unit 7,8 can also be used, for example, aluminum window frames with internal Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, merit for money!
179, triangle valve should not be disregarded, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if I were you installed, only the last copper fittings installed on the faucet to take over the baby when it was installed to check whether the internal leakage, the aggregate leakage deserving to pressure some time to test out the final installation of internal and leading it more secure.
180, even the diary has been renovated to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to rely on them.
181, fitting the biggest problem is communication!
182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.
183, general decoration, decoration companies, excluding the formal management fees, tariffs, fares accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, in the kitchen to go outside the ground water, since home improvement is to give a time bombard, who state clearly whether Shashi Hou for his trouble.
185, if the separate tube wear, but in a tank, the impact it? Effects can persevere
186, ask what between the dining and living room separated by the most cost-effective package door pockets, side bag only 6 cm or contaminated with white, height 2 m is not significantly large High raw.
187, respectively, to strong and weak electrical displacement pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can see the tube.
188,
2011 Supra Shoes, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood kernel board, do not handle with furniture inside.
189, PCT board and the cabinet can be wood core board 15, the back of the 5 available folders, Wuli. Package doors and Tizi use nine per penny. Different processes with different materials.
190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leaks, high water of green materials.
191, paint board is good, the advantages of either wood and composite.
192, do not print for a long period on the rainy synthetic stone, unless you ambition to dry a typography table; not take long wet slitting embark on the table. Wood wet periodically discolor; rub the dye with a steel pellet, like hand squeeze pimples.
193, can use an mediocre gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly check the ventilation opening on the line.
194, explicit contracting the tx Please memorandum that you must validate the renovation crew to open a account of matters. There may be certain about their estimates, I also believe that they, and the results to buy cable and cord treatment nearly doubled.
195, the size of certain planned sanitary ware, the best limn in advance, calculate the size.
196, buy the product the students pay attention to the door, if you want to chase results matching panel with a commerce package Door, then you may must be Henzai sword it!
197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, equitable make sure where is the basin faucet, bathtub faucet, bathing machine what's on the line guiding, leading 99 percent sign and fell into the water are in line with international norms, at the peak of operators are not slovenly, entire right. If you own basin cabinet, basin bought in advance, or optimistic approximately the size. Determine the measure of units in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the spectators or on stage. Distance between peppery and cold water pipes with concrete tiles must be sealed before the 15 cm precision, and must be collateral. If you have bought, it is best put someone, such as sealed behind the unload.
198, if an 8-core cable at the same time take the phone and network, ambition not mediate with each other it? Not. 1,2,3,6 hit the cable module, 4, 5 playing on the call module, and the additional two lightly. Right in saying that my experience: 10M 1236 100M to be accustomed with the truth that the speed to 10/100M that we ambition not feel anyone difference if using a 8pin line, then some program-controlled switches marking will occasion the network signal interference in the home context generally will not have any problem. But recess assured that I can suggest such a separate route to the future, quit margin, cable is very cheap you say?
199, retard the distribution carton must be properly installed.
200, fitted bath and shower faucet lesson taps joined to the tube is embedded in the wall, I have repeatedly told them to get accurate dimensions, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the coerce was the nestle. Yesterday I found that fb GROHE thermostatic mixer wrapping even be forced cracked. We can be installed if the chairman, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.