Quickly ruled out simple block of ice trick
Air when the water has drained. Low-pressure pipe must be quickly carried into the compressor suction pipe welding. 4. Compressor starts about 1 minute to allow air to the condenser, capillary tube,
Salvatore Ferragamo outlet, evaporator discharge of residual refrigerant. 5. In the process pipe connected on three-way valve, connected on a three-way valve in the refrigerant bottle, close-way valve, open the refrigerant bottle valve. This step and the compressor discharge refrigerant at the same time, can save time. Process tube tops three-way valve installed on Step 5, because in Step 2 on the process pipe welding, copper is also hot. 6. Shut down the compressor. Under the welding filter drier. 7. Plugged with rubber stoppers compressor suction nozzle, or tied with tape like the compressor suction nozzle to the compressor suction pressure not to be rushed to open the mouth, not into the air shall prevail. 8. Three-way valve opens the valve to allow refrigerant flow eight compressor, and start the compressor, so that the refrigerant from the condenser then drying the filter port exhaust (condenser port can be blocked by hand, I feel pressure when the hand let go, greater pressure refrigerant spray). In this way, the condenser where the air is discharged. Compressor minutes downtime. During this period, intermittent opening and closing the valve three-way valve. 9. Condenser when the port is not gas out, the new filter in the condenser on one end of welding, welding on the other side capillary. ] 0. Start the compressor and remove the air pipe cooling system. Hold down the low-pressure pipe port hand,
herve leger sale, I feel no air emissions, the three-way valve opens the valve, so that the refrigerant into the compressor, compressor pressure, the refrigerant air together with low-pressure pipe from the evaporator pressure out of the port. Compressor 1 to 2 minutes, compressor stops first. Three-way valve and then shut the valve, feeling out of the evaporator when the air port there, quickly open the compressor suction nozzle, the low-pressure compressor suction tube into the pipe, process pipe and quickly open the three-way valve. As soon as possible to weld low-pressure compressor suction pipe and pipe fittings, and then immediately open the valve three-way valve, three-way valve so that refrigerant expel the air inside the tube,
herve leger toronto, connect it in the process pipe. 1O first step to go, the sooner the better, let air into the cooling system pipes have the time. However, remove the three-way valve on the tube technology this step should not be spared, because the cooling system within the existing refrigerant piping, suction tube in the welding temperature, pressure pipe,
MBTシューズ 販売店, tube can be discharged from the process, easy to weld. Then do not worry about the air tube into the compressor from the process, because the compressor high pressure than atmospheric pressure. 11. According to conventional charge refrigerant to the tube sealing process. Boron J Sibaohuangqi. Plastic an automatic washing machine Haier board maintenance port Anonymous Haier XPB50-62B Home maintenance test machine: Press the shiny. At the same time turn the water, but this time press the Suspected key leakage, but leakage no open signs measured button; board with a hair dryer heat, is invalid. Proof nor moisture. Detailed investigation of the back plate removed (Note: the water level switch to be split back, or they will not enter the repair status, fault code will be displayed and the alarm more than F1). The first four weeks with a sharp knife cut along the glue board, peeling it off with the shell, after all unglued, with more than a thin flat screwdriver inserted along the seam. Uniform / J ~, D Lever, complete removal of the motherboard. Carefully observe the back of the motherboard. Found that Will remove the glue here, cleaning, scraping weight after welding, with Rxlk block resistance test two pins are unstable, and then along the road to find the Shun D3 search to D1,
vibram five fingers outlet, the D1 and resistor R1 CPU connection is disconnected, and the operation back to normal, but display the phenomenon of incomplete strokes are found torn off R1, the program normally, indicating a fault in this, why then disconnect on the RI and Rl 'D1 dehydration indicator light never had it? and other indicators with row 1) 2 1) 4, the resistance is quite different: I) 1 are positive and negative phase 1 () kn about resistance, and D2 ~ D4 is a great difference between positive and negative resistance. Remove D1, measuring positive and negative phase resistance is 7kO ~ 10kO, exactly the same as a resistor. Take a long time to test, there is substantial instability leakage values. Replacement of light-emitting diodes DI, all functions return to normal. Restore all lines, with 704 rubber seal, the power on the machine, everything OK. Bin In general, CPU work in low-potential, low current state, the failure rate is not high, most of the surrounding components bad. I (please contact the author and Articles)
More articles related to topics:
tods shoes outlet bvr hkk zwap who
Beats By Dre Headphones biz zec wkeq ucm