civil engineering formula for calculating aggregate
flat ground rules: the thickness of the building site within the ± 30cm cut, fill,
cheap mbt shoes, transport, and leveling.
1, land leveling and calculation rules
(1) list of rules: the icon size by design the first floor area of a building.
(2) a fixed rule: according to the design icon size to the first floor area of buildings.
2, land leveling method
(1) list of rules for the formation of site area: List the rules of flat ground floor building area = area
(2) a fixed area of flat ground rules: Fixed rules of flat ground floor building area = area
3, Note
(1), fixed rules in some areas of flat ground area: external skin line by putting 2 meters calculation. Calculation by putting the external walls of 2 meters outside the line of block graphic terms, and then combined with the bottom floor area; or press the . So there will be as difficult calculation:
①, divided block is too much trouble, some hard to deal with the arc, prone to error.
②, 2 meters of the centerline of arithmetic more difficult, not calculation.
③, putting 2 meters after the overlap may occur, in the end should not calculate how much less.
(2), list of environment may require bidders to purchase when the actual situation according to the site calculated the amount of land leveling works, putting the length of each side is different.
Big Dig earth
1, excavation earthwork calculation rules
(1), list of rules: basic earthworks dug by the design basis for the icon size to cushion the bottom area by digging deep computing.
(2), the fixed rule: manual or mechanical excavation bottom area of the volume should be calculated by multiplying the depth of excavation. Bottom area should be multiplied by the bottom of the long bottom width, length and width of bottom cushion is outside the wire and concrete surfaces, where drainage ditches to drain should be considered outside the lines. The total volume of drainage should be incorporated into the earthwork. When you need to put slope, slope of the earthwork should be put on the total combined volume of the earth.
2, earthwork excavation method
(1), list of rules:
①, calculated the end of the excavation area:
Method one, using the bottom of the floor area + wall area of the skin to cushion the skin. Line to the wall outside the area of cushion outside line (by putting the external walls of the outside line or by graphical calculation block
second method, block line outside the area of cushion calculation (calculation of floor area with the block).
②, calculate the volume of excavation: excavation earthwork volume = area * bottom digging depth.
(2),
mbt anti shoe, fixed rules:
①, bevel size calculated using the upper and lower end of the excavation area.
V = 1 / 6 × H × (S on the + 4 × S + S in the bottom) earthwork volume calculations (which, S for the area on the bottom, S for the cross-sectional area, S under the under the bottom area) . As shown below
S = the bottom of the building under the exterior skin of the excavation area + bottom edge of the area (including the face, drainage, grading, etc.).
calculated the same way
S, and S under
3, calculated excavation difficult
⑴, calculated on the excavation area of the lower end of the time necessary to calculate
⑵, not calculated in the cross-sectional area.
⑶, overlapping local bad deal (with the flat ground.)
⑷, if there is some edge cut slope coefficient is inconsistent, difficult to handle.
4, a large excavation and foundation trench excavation, excavation of the relations
bottom width of 3m or less than three times the width and length of the bottom area of 20m2 or less than those for the ground slot, the rest is excavation.
Full base cushion
1, Full cushion base quantities:
shown, (1), the volume of cushion element (2), the volume of cushion lime (3), the volume of concrete cushion (3) cushion template
2, Full cushion engineering calculation method based
⑴, calculate the volume of cushion elements:
formula using bevel: prime cushion volume = 1 / 6 × H × (S on the + 4 × S + S in the bottom) earthwork volume calculation
(which, S for the area on the bottom, S for the cross-sectional area, S under the under the bottom area).
⑵, lime cushion volume calculation:
formula using bevel: lime cushion volume = 1 / 6 × H × (S on the + 4 × S + S in the bottom) earthwork volume calculation
(which, S for the area on the bottom,
mbt shoes uk, S for the cross-sectional area, S under the under the bottom area).
⑶, the calculation of the volume of concrete elements: concrete foundation base cushion and divided by the thickness of concrete, concrete thickness less than 12cm to execute cushion subheadings; thickness of 12cm to execute outside the base subdirectory.
cushion cushion volume = area × cushion thickness.
⑷, cushion the calculation of the template:
template = cushion cushion cushion perimeter × height
3, Full cushion engineering calculation based on the difficulty
⑴, calculating prime cushion, lime soil cushion on the bottom area under the time needed in the calculation of
⑵, not calculated in the cross-sectional area.
⑶, overlapping local bad deal (with the flat ground.)
⑷, if there is some edge cut slope coefficient is inconsistent, difficult to handle.
Full
based
1, the amount of foundation works full house
shown, (1), based on the volume of full house (2), packed with basic templates (4), full house foundation beam size (5) Full foundation beam template
2, packed with basic engineering calculation methods
⑴, based on the volume of full house
① calculation methods: full house at the end of the basis of the maximum area over the base area × thickness of the plate - the volume of multi-operator part of the Triangle
full house at the end of the maximum area based on floor area + wall area = full house outside the line of skin to the area
belt size = slope × multi-operator part of the center line of the triangle perimeter of cross-sectional area
② method two: full house full house based on the top of the base area × thickness + ladder size
Full foundation
top floor area + wall area = skin to the outside line of the area full house - the width of the area slopes
ladder volume = length × slope trapezoidal cross section area of the center line
③ calculation of the three: full house at the end of the basis of the maximum area of the base area × Full thickness of the sides did not play from the edge bevel + size
(2), full house based on the template:
① calculation methods: Tianjin Construction Engineering budget base price in 2004 based on a template by full house full house foundation concrete terms of volume.
② method two: full house rules in some areas based on a fixed template = full length of the base outside the lines outside the line of the base × height over + over the center line of the circumference of the base slopes plagioclase × over the base slope.
(3), full house foundation beam
① the size of foundation beams full house
method: full house foundation beam net beam volume = length × beam clear height
② full house foundation beams template
calculation methods: Tianjin base price in 2004 based on beam construction budget based on a template by Full terms of volume of concrete beams.
calculation of the two: full house rules in some areas based on a fixed template = beam above the net over the side of the base beam above the full length × net height + base side of the beam head area.
3, full house engineering calculation based on the difficulty
⑴, calculated based on the volume of full house, the exterior skin to the full house part of the region outside the line, the slope of the centerline of the width of some regions such as the length of the figure it is too much trouble (with the flat ground.)
⑵, calculated based on net long beam, we must consider the interaction between intersecting beams deduction problem.
⑶, packed with a template based on the calculation of beam must be considered over the base and the cross beams between the deduction problem.
strip foundation
1, strip foundation quantities
shown, (1), prime cushion quantities (2), lime cushion quantities (3), concrete cushion quantities (4), concrete cushion template (5), bar basic quantities: brick base; concrete strip foundation (6), concrete strip foundation template (7),
mbt chapa, to project the amount of ring beam (8), to ring beam template (9), based on the amount of wall construction (10) earth-based slot volume (11) supported retaining plate quantities (11) bottom of volume of solder Exploration Project
2, strip based method
(1) prime cushion quantities
external walls of soil-based factors
Quantity = the length of the external walls of the center line of prime land soil cross-sectional area × prime
strip foundation walls
prime factors of soil engineering soil interior volume = length × net long-term cross-sectional area of soil elements
(2) the amount of lime cushion works
strip foundation wall exterior lime lime works volume = length × lime centerline cross-sectional area
strip foundation walls interior walls lime lime works volume = length × lime net long-term cross-sectional area
(3) concrete cushion quantities
concrete strip foundation wall base = external cushion cushion the centerline of the concrete strip foundation concrete cushion length × cross-sectional area
cushion interior concrete strip foundation strip foundation walls of concrete foundation = net long-term cushion cushion length × cross-sectional area of concrete
(4) quantities of strip foundation strip foundation wall
Quantity = the length of the external walls of the center line of strip foundation strip-based cross-sectional area ×
strip the foundation of the interior walls of strip foundation beams = length × net long-term cross-sectional area of strip foundation
Note: ① the calculation of net long-term basis by brick walls strip calculation of net long-term
② concrete strip foundation calculated by hierarchical net long-term
some areas (Tianjin) calculation rules, strip footing to the top of the line to ring beam, which resulted in the calculation must be added when the wall below the height of + -0.000; and simultaneously strip foundation of a project When the different elevation of the ring beam, when calculating the wall must distinguish between the bottom elevation of a wall, causing trouble on hand.
(5), concrete cushion template
① calculation methods: Tianjin, 2004, the base price of concrete construction budget template Cushion Cushion by concrete terms of volume.
② The second method: concrete in some areas the rules fixed template = concrete cushion cushion cushion side of the net length × height of concrete
(6), concrete strip foundation template
① calculation methods: Tianjin, the base price of 2004 construction budget template by concrete strip foundation concrete strip foundation of volume.
② The second method: fixed the rules in some areas of the concrete strip foundation template = concrete strip foundation side of the net long concrete bar base × height.
(7), to ring beam quantities
wall to wall ring beam to the project volume = length × ring beam to the center line of the ring beam cross-sectional area
interior wall to interior wall ring beam to ring beam construction beam = the length of net long-term cross-sectional area × to ring beam
(8), to ring beam template
① calculation methods: Tianjin base price in 2004 to ring beam construction budget template according to ring beam of volume.
② calculation of the two: the rules in some areas to ring beam fixed to ring beam side of the net template = L × to ring beam height
(9) foundation wall quantities
exterior foundation wall of the quantities = exterior foundation wall the length of the center line of the cross-sectional area × foundation walls
interior foundation wall of the interior foundation wall engineering beam = the length of net long-term cross-sectional area × foundation walls
(10) moving the base slot size
foundation trench of earth-based slot cross-section volume = area × length of foundation trench of the net
exterior wall to bottom of the center line of slot lengths according to calculations by the length of interior wall to interior wall bottom slot net long basis, plus face width by the width of the icon size calculation, the groove depth of the natural floor to the bottom of calculations. When you need to put slope, slope of the earthwork should be put on the total combined volume of the earth.
(11) supported retaining plate quantities
quantities of retaining soil plate, the vertical area of the tank,
mbt lami, earth retaining board, no further grading calculation.
(12) bottom of the tank bottom brazing filler quantities probe the amount of exploration work to bottom of area calculation.
3, the calculation of the amount of strip foundation engineering difficulties
⑴ strip foundation layers of entities, net long-term is difficult to count
⑵ physical layers of strip foundation calculated the net long-term, consider the case of intersection with the wall, taking into account the case of intersection with the interior walls, interior walls are usually horizontal part of the calculation, the vertical part of the breaking terms, this article cell layers form the basis of the net length of the figure it is very troublesome entity.
⑶ earthwork calculations take into account face and cut slope, calculate deductions too much trouble.
independent foundation
1, independent of the amount of foundation works
(1) independent of the volume of cushion based on (2) Independent volume basis (3), independent foundation cushion base template (4), independent foundation template (5) earthwork excavation volume (6) bottom drill exploration Quantities
2, independent base manual method
⑴, independent of the volume of cushion based
cushion cushion volume = area × cushion thickness
⑵, independent foundation cushion template
template = cushion cushion cushion circumference × height
⑶, independent basis for volume
volume =
independent foundation layers add volume (with rectangular and bevel formula)
⑷,
mbt shoes sale, independent foundation template
independent foundation template = template layers of perimeter × floors high
(5) Foundation earthwork
volume of earthwork excavation pit bottom area shall be calculated by multiplying the depth of excavation. Pit bottom area should be multiplied by the excavation pit at the end of the long end of the width, length and width of pit bottom cushion is outside the wire and concrete surfaces, if any, should be counted to the drain gutter outside the lines. The total volume of drainage should be incorporated into the earthwork. When you need to put slope, slope of the earthwork should be put on the total combined volume of the earth.
(6) the amount of bottom drill exploration projects
drill exploration quantities bottom to bottom of area calculation.
2, independent of the calculation of quantities based difficult
① shaped not calculated independently based on the volume.
② independent foundation with the amount of other deductions not based on intersection calculations.
③ earthwork calculations take into account face and cut slope, calculate deductions too much trouble.
cap foundation
1, cap the amount of foundation works
(1) cap the basis of the volume of cushion (2) the basis of volume cap (3), cap foundation cushion base template (4), a basic template caps (5) earthwork excavation volume (6) bottom of drill exploration quantities
2, independent base manual method
⑴, cap the volume of cushion based
cushion cushion volume = area × cushion thickness
⑵, cap foundation cushion template
template = cushion cushion cushion circumference × height
⑶, cap foundation volume
volume =
independent foundation layers add volume (with rectangular and bevel formula)
⑷, cap foundation template
independent foundation template = template layers of perimeter × floors high
(5) Foundation earthwork
volume of earthwork excavation pit bottom area shall be calculated by multiplying the depth of excavation. Pit bottom area should be multiplied by the excavation pit at the end of the long end of the width, length and width of pit bottom cushion is outside the wire and concrete surfaces, if any, should be counted to the drain gutter outside the lines. The total volume of drainage should be incorporated into the earthwork. When you need to put slope, slope of the earthwork should be put on the total combined volume of the earth.
(6) the amount of bottom drill exploration projects
drill exploration quantities bottom to bottom of area calculation.
3, cap the calculation of quantities based difficult
① shaped cap calculated based on the volume is not good.
② Pile Foundation and other basic deductible amount when a bad intersection calculations.
③ earthwork calculations take into account face and cut slope, calculate deductions too much trouble.
pile
1, production of precast reinforced concrete piles according to the design icon size by volume, length, full-length by including the calculation of the pile tip, pile tip virtual volume is not deductible.
2, sprayed concrete according to design icon size of volume.
3, reinforced concrete and mud holes bored by the volume of transportation of natural outdoor terrace to the end of the length of the pile cross-sectional area multiplied by the pile in terms of volume.
4, reinforced concrete pouring of concrete the size of bored pile length and design according to design super-filling pile length and multiplied by the cross-sectional area of volume.
5, to play the amount of precast reinforced concrete piles, pile sections multiplied by the length of the whole pile by volume, the virtual volume of the pile tip is not deductible. Hollow part of the volume of concrete pipe should be deducted, not including the hollow filled with concrete pipe used in quantity.
6, the amount of pile construction, pile cross-section multiplied by the pile at the depth of volume. Pile depth for the pile driver machine at the end to the distance between the top of the pile. (According to the natural ground to the top of the pile design calculation of the distance plus 50cm)
7, the volume of cement mixing pile, according to the design pile length multiplied by the design of pile sectional area of volume.
8, the pouring of concrete diaphragm wall design icon size in accordance with terms of volume.
earth backfill, earth
1, soil (rock) side backfill according to the design icon size of volume.
(1) space filling: Filling area multiplied by the average thickness Backfill.
(2) Indoor backfill: the net area between the main wall thickness multiplied by the backfill.
(3) foundation backfill: design of the outdoor excavation volume minus the floor laid the basis for the following volume (including basic bedding and other structures.)
(4) Trench Backfill: Excavation volume of less than 200mm diameter, bedding and trench volume.
2, dig trough the original soil backfill quantities, according to the amount of tank excavation calculated by multiplying coefficient of 0.6.
good weight for a cubic concrete reinforced concrete
1 cubic weight 25KN, which is about 2551 kg
plain concrete generally by 2.34 tons a cubic meter