on the issuance of ; Hunan network
on the property the issuance of notice
district, county (city) Housing Property Authority, Planning Authority, Great River pilot District Land Planning, planning and construction of high-tech zones Real Estate Board, the construction unit: now management space requirements
First, the transfer of the property management space design and construction standards:
(a) the house wall should be brushing paint, brushing the roof or ceiling should be paint, floor tile laying, tiling bathroom wall tile and floor should be the installation of sanitary ware;
(b) the property management space should have separate conditions of use. Must meet safety, fire protection, environmental protection, health and other requirements, the upper and lower water and power supply should have normal function, and independent billing;
(c) the communication within the project configuration, cable TV broadband and other facilities, the room should be reserved for use in property management port, with normal use function.
Second, the property management space and other ancillary equipment space design principles:
(a) in accordance with property owners, the principle of setting convenient service , single-family homes on the first floor should be part of the property management space; high-rise building property management space should be on the sixth floor below, the following multi-storey buildings should be on the third floor, and with natural ventilation,
nike air max 90, lighting and other conditions;
(b) To facilitate the use of the property management unit, to intensive,
tory burch logo clutch, centralized management effectiveness, equipment, facilities, buildings (including secondary water supply, high and low voltage power distribution,
tod gommino, fire fighting water supply, etc.) should focus on setting; fire control room , TV control room and property management call center set up to concentrate.
(c) To facilitate cleaning, no public toilets in high-rise residential buildings should be set fire stairwell cleaning sewage water points and channels.
Changsha City property management space requirements
the first to promote the healthy development of the property management market, to ensure the proper use and management of the property, under the Law,
Second approach for the city urban planning area within the new state-owned land in the property development project management space planning, design, construction and use management.
The term property management property management space, including office space, support space and property management office space and other owners of the Committee.
storey or less than 2.2 m have been included in the share of public housing are not included in the property management space area; property management space must be relatively concentrated, with natural ventilation and lighting conditions, building elevation should be more than plus or minus zero.
third space belongs to all owners of property management all together, for property management services, organized by the property management unit is responsible for routine maintenance, maintenance, repair and retrofit of large and medium shall be allocated funds from property maintenance.
The municipal planning bureau is responsible for the city property management space planning approval and acceptance of supervision and management. Real Estate Board is responsible for recognition of the city property management and property management space space transfer, use of supervision and management. Article
new development projects shall not be less than the total construction area of development and construction (including above and below ground, including underground garage, according to 50% proportion, the same below) thousand the ratio of three to five thousandths of configuration space property management, construction costs included in cost:
(a) the total building size of 200,000 square meters, according to five thousandths the proportion of property management configuration space; property management building area of not less than 150 square meters, not less than two between natural between;
(b) of the total building size of 200,000 square meters, in addition to five thousandths of 200,000 square meters, according to the proportion of the configuration, the excess beyond the area per thousand according to the proportion of configurations. Article
total building size of 100,000 square meters of residential area, the property management space should be set in the center or residential district near the main entrance.
Article 7 The municipal Planning Board do not meet the provisions of Article V of the project construction drawings will not be approved. Planning the construction unit should be built in the single figure mark the location of the property management space and area, and construction projects simultaneously design, simultaneous construction, submitted three months before the first delivery of property management units. Article
construction unit in the process of location, area maps and planning to be built
Article IX apply for housing units in the building of the initial registration of ownership,
chanel, should be applied to the property management space. City Property Bureau Property Management space on the housing register to be recorded, and the housing register to form the basic unit of association does not issue a certificate of housing ownership. Article
construction units should be in the property management space within 30 days after final acceptance for transfer acceptance. First, the construction unit and the property management unit for the transfer and acceptance:
(a) the parties shall be in accordance with the provisions of this Article Supplementary Measures standards for the transfer and acceptance. Meet the requirements on the use of functions, both in the transfer of the property management space signed and sealed by a formal acceptance of the transfer list. Use of functional problems, the parties should agree a solution and time, and the timely completion of the transfer of inspection.
(b) both sides within 10 days after the handover procedures, property management unit shall be the property management space situation in the property within the notice area, while holding the property management space list and notice that the transfer and acceptance , to record where the District Real Estate Board.
form owners' committees, the property management unit shall inform the owners of the property management space committee, the construction unit and the owners of the property management space for the Commission a written transfer procedures.
Article XI phased construction project by the property management space planning requirements in the late construction, the construction unit shall first provide the first line with the requirements of Annex temporary use of property management room.
Article XII of the property management unit on the turn, the original owners of the property management unit should be the Commission or a new property management unit of the property management space for the transfer and acceptance. The former property management company fails to transfer the property management space and related information from the real estate administrative departments shall be punished according to relevant laws and regulations.
Article XIII county, city property management space confirmation reference to these provisions.
provisions of Article XIV from June 1, 2009 shall come into force.
Supplementary:
; second ○ ○ 九年 四月 二十 一日
Changsha property rights Changsha City Planning Authority Board