单项别墅机电工程工序
46. drainage upvc sleeves in concrete 混凝土中upvc排水套管
47.water supply upvc sleeves in concrete混凝土中upvc给水套管
48. electrical system holes, trenches and ducts in concrete 混凝土中电气系统的孔洞、沟槽和导管
49. electrical pvc pipe, junction,
gucci purse, switch and socket box:pvc电管、接线盒、配电箱、插座
50. installation of roof drain inlet, balcony drain SL屋面排水口、阳台排水口的安装?
51. duct installation 风管安装
52. lighting system wiring 照明系统配线
53. pipe/cable tray installation 管道/电缆托架安装
54. low current-LV system wiring 弱电系统配线
55.junction, switch and socket box接线盒、配电箱、插座
56.cabinet (panel) SMDB/DB/FDB installation总配电箱\调配电箱\小配电箱安装
57. PEX pipe installation with fittings: PEX给水管及配件安装
58. LPGS pvc sleeve pipe in wall墙中液化石油气pvc套管
59. cable installation 电缆安装
60. electrical meter box installation 电器仪表箱安装
61. installation of telephone MDF, LCJB, socket电话主配线板、分线箱、插座安装
62. installation of duct flexible connectors 风管软接头安装
63. A/C electrical tube and cable installation 空调电管和电缆安装
64. installation of audio visual system 视频、音频系统安装
65. cabinet, speaker, KP, control cable 电柜、扬声器、KP、控制电缆
66. installation of floor drain cover, grating 地面排水管盖子和格栅的安装
67. LPGS valve chamber 液化石油气阀室
68. CCTV system rack, monitor,
christian louboutin pumps website, camera installation闭路电视系统架子、监督器和摄像机的安装
69. installation of fan coil units风机盘管安装
70. LPGS meter boxes液化石油气仪表箱
71. testing and commissioning 检测和调试
72. installation of water pump in water plant room 自来水厂水泵的安装
73. installation of exhaust fan 排气扇的安装
74. video intercom system equipment,
d&g jeans, handset wiring 视频内部通讯系统设备和电话机的配线
75. telephone and data system testing and commissioning 电话和数据系统测试和调试
76. LPGS equipment installation 液化石油气设备安装
77. water heater installation 热水器安装
78. installation of grills, diffusers, louvers and damper格栅、风口、遮光栅格、格栅阀的安装
79. video intercom system testing and commissioning 视频内部通信系统测试和调试
80. LPGS detector and switch 液化石油气检测器和开关
81. A/C thermostat installation 空调恒温器安装
82. lighting equipment and light fixtures installation 照明装备跟灯具装置
83. LPGS testing and commissioning 液化石油气检测和调试
84. installation of sanitary fixtures and water mixers 卫生洁具和搅水器的安装
85. installation of fire extinguishers 灭火器的安装
86. door bell installation 门铃安装
87. testing and commissioning-W/S system防水系统的测试和安装?
88. testing and commissioning-power and lighting system 电力和照明体系的测试和调试
89. fire blanket installation消防毯安装
90. portable fire extinguishers便携式灭火器
91. A/C equipment base 空调设备基础
92. installation of A/C duct split unit风管分别安装的安装
93. A/C-testing and commissioning 空调的测试和调试
94. electrical and mechanical testing and commissioning 机电测试和调试
单项别墅内装修工序
95. hollow/solid/thermal block 空心/实心/保温砌块
96. precast lintels 预制过梁
97. internal plaster for concrete soffit室内混凝土底面抹灰
98. blockwork-boundary wall 围墙砌筑
99. internal wall plaster with preparation 室内墙壁抹灰及制备
100 boundary wall columns and coping 围墙柱子和墙帽
101 plaster to boundary wall 围墙抹灰
102 wall tile with preparation墙砖及预备
103 external plaster preparation 室外抹灰准备
104 water proofing wet areas 湿润部位防水
105 floor tiles with preparation 地板砖及准备
106 external plaster 室外抹灰
107 marble slab-20mm 大理石板-20mm
108 marble-skirting 大理石踢脚线
109 marble sills for windows 大理石窗台
110 marble steps for internal stairs室内楼梯大理石台阶
111 terracotta tile 陶瓷砖
112 gypsum plaster board/gypsum tiles/bulkhead/PVC/MDF石膏板/石膏砖/隔板/PVC/中密度板
113 terracotta skirting陶瓷踢脚线
114 terracotta tile for external steps 室外台阶陶瓷砖
115 threshold 门槛
116 counter top/vanity top 柜台/梳洗台
117 typical railings to staircase and terrace 楼梯和平台的尺度栏杆
118 light weight foam concrete 轻质泡沫混凝土
119 internal paint for ceiling 室内吊顶刷涂料
120 UPVC exterior doors and windows 室外UPVC门窗
121 washroom accessories 盥洗室附件
122 internal paint to gypsum board ceiling 室内石膏板吊顶刷涂料
123 mirrors with polished aluminum frames 抛光铝框镜子
124 roof water proofing屋面防水
125 internal paint for plastered wall 室内抹灰墙面刷涂料
126 railing to rotunda 圆厅栏杆
127 door for electrical room 配电房的门
128 water mixer混杂器
129 roof tile pavers/roofing works 屋面砖/屋面工程
130 fixing of kitchen cabinets 厨柜的安装
131 wooden doors internal 室内木门
132 roof access hatch and ladder/GRP ladder for water tank 屋面检讨孔和梯子/水箱的玻璃钢梯子
133 clay tiles 陶砖
134 fixing of wardrobes 壁橱的安装
135 wooden gates-front and seaside 正面和海边的木门
136 marshrabiah/timber fencing 木雕刻/木围墙
单项别墅外装修和室外工程工序
137 GRC works around windows 窗子四周的玻璃(纤维)加强混凝土
138 GRC works around doors 门周围的玻璃(纤维)增强混凝土
139 compacted granular fill/soft landscaping 压实的粒状填料/软绿化
140 hardscaping 硬质景观
141swimming pool finishes 游泳池装修
142 external paint for exterior elevation外墙破面刷涂料
143 paint to boundary wall 围墙刷涂料
144 kerbs and kerbstones 路缘石
145 interlock concrete pavers 嵌锁混凝土铺面块
146 snagging and final inspection 肃清艰苦和终极验收
147 demobilization and handing over 撤场和移交
148 mobilization: 施工筹备、发动
149 project duration 名目工期
150 cash flow 现金流量
151 critical path专键门路
152 milestone 里程碑
153 critical acitivity 专键功课
六、测量工程survey work
1.现场 site, jobsite 2.控制点 control point (station)
3.坐标 coordinates 4. 高程 level, elevation
5. 平面坐标 plane coordinates 6. 全站仪 total station instrument
7. 夹角 angle 8. 误差 error
9. 容许误差permissible tolerances 10. 水准仪 spirit level
11. 来回丈量to-and-from survey 12. 闭合差 misclosure
13. 现场掌握网Site Control Grid
14.现场节制点加密 Addition of site control points
15. 轴线 axis 16. 角点corner points
17. 围墙边界 fence wall boundary 18 地块边界 plot limit
19. 定位 positioning 20. 边长 border length
21. 一级把持网first control grid 22. 极坐标法method of polar coordinates
23. 闭合 closure 24. 附合测法 method of connecting level survey
25. 施工测量Construction Survey 26. 控制线 control line
27. 地位线 position lines 28. 轴线投测 transfer survey of axes
29. 标高抄测 level survey 30. 程度线level line
31. 弹线 draw a line 32. 基准点 datum point
33. 均匀标高 mean elevation (level) 34. 引测 transfer survey
35. 平行借线法 method of parallel line transfer
36. 沉降观测Observation and Measurement of Settlement
37. 验线Verification of Lines 38. 测量员 surveyor
39. 经纬仪 theodolite 40. 钢尺steel rule
41. 塔尺leveling pole
七、钢筋工程 REINFORCEMENT1. 变形钢筋 deformed bar 2. 特点强度characteristic strength
3. 规格和型号specs and type 4. 出厂品质证实书mill certificate
5. 试验讲演单test report 6. 切割和曲折 cut and bend
7. 钢筋测验test of reinforcement 8. 机能复试 performance.retest
9. 试验样品test specimen (sample) 10. 钢筋掩护层Rebar Cover
11. 砼的腐化corrosion of concrete 12. 钢筋锈蚀rusting of reinforcing steel
13. 密实性compactibility 14. 细石砼垫块fine stone concrete block
15. 钢筋的衔接rebar joining 16. 钢筋搭接 rebar splicing
17. 纵筋longitudinal reinforcement 18. 搭接长度 splice length
19. 光圆钢筋plain round bar 20. 钢筋加工rebar processing
21. 化学成分实验chemical (composition) analysis
22. 构件 element 23. 跨度 span
24. 截面 cross section 25. 排放图 rebar shopdrawing
26. 配料单 cutting list 27. 钢筋下料cut and bend
28. 钢筋上挂牌label on rebar
29. 加工、寄存、运输、绑扎process, storage, transport and binding of rebar.
30. 铁锈 iron rust 31. 油渍 oil stain
32. 无伤害free of damage 33. 钢筋绑扎rebar placement
34. 铁丝 iron wire 35. 八字扣8 character-like buckle
36. 箍筋 stirrup, link 36. 弯钩 hook
37. 基本钢筋 Foundation Rebar 38. 工艺流程process flow
39. 柱子插筋 column starter,
princess perfume,starter bar 40. 钢筋网bar mesh
41. 柱钢筋Column Bar 42. 主筋main reinforcement
43 柱外皮尺寸线outer dimension lines of column
44. 箍筋间距 stirrup spacing 45. 缠扣绑扎tangled buckle
46. 梁钢筋reinforcement of Beam
47. 持续梁、悬臂梁、简支梁continuous beam, cantilever beam, simply-supported beam
48. 上部纵筋top main reinforcements 49. 楼板钢筋slab reinforcement
50. 钢筋马凳 chair bar 51. 楼梯钢筋 staircase reinforcement
52. 散布筋 distribution bar 53. 踏步筋 step bar
54. 末端锚固 end anchorage
55. 缺扣、松扣absent buckles or loose buckles
56. 成品维护protection of finished product 57. 钢筋调剂adjustment of bar
58. 预留钢筋reserved bars
59. 自检、互检、交接检self-check, mutual check and cross check
60. 绳卡rope clip 61. 钢筋绑扎rebar placement
62 主筋 main reinforcement, principal reinforcement
63 上部和下部钢筋 top and bottom reinforcement
64 钢丝 wire fabric 65 定位钢筋 spacer bar
66 点焊tack welding 67 弯曲试验bend test
68 环氧涂层epoxy coating 69 cutting list, bar bending schedule下料单