Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > General Free Advertising Directories

General Free Advertising Directories This is a list of general free advertising directories.

Reply
 
Thread Tools Search this Thread Display Modes
Old 06-11-2011, 03:14 PM   #1
alicetrade9i
 
Posts: n/a
Default 始终都爱好一个人的时间

仰望 低吟 空想。
  各式各样的画面迟缓的再脑海见跳跃 痛苦悲伤的不以言表。
  何时开始不喜欢人潮磅礴的地段 怪异的喜欢一个人独自举动。
  享受着只处于本身一人的时光 只想与自己喜欢的人倾诉鲜为人知的故事。
  独处时坐在冰冷的地板间 以不知的片名找到陌生电影。
  打散了空泛的空隙 响起片子的背景音乐。
  
  
  一个人的世界本来就是属于一个人。
  早容不下任何一个人。
  习惯了寂寞 你要明白寂寞很长。
  不要再去奢望有任何的朋友。
  由于他们进不了你的世界 进去了。
  也只是个荒诞的误解 。
  不要再养成有人陪的习惯 否则一个人的时候会很伤。
  把自己封在自己的世界里 自己一个人独享这份孤单。
  其实孤独也很美 一个人安安悄悄的。
  没有任何的嘈杂 没有任何的吵闹。
  没有和人的勾心斗角 尔虞我诈。
  孤单 眼来也是如此简略如斯美。
  满路都是荆棘 满路都是碎片。
  怕什么 不足为惧。
  想到要前进就什么都不怕了。
  曾经最要好的朋友。
  一个一个都在变更 。
  开始觉得陌生起来。
  感觉距离越来越遥远却又无法禁止。
  曾经 只是个回不去的过去式。
  很难设想将来的我们这些人的关联。
  疲惫了 越想顺其做作的生活。
  不去管是与非 你是你 我是我 他是他。
  是不是这样的关系能力阐明 大家。
  都长大了 成熟了 还是要抒发自己独破的一面。
  听着以前大家听过的歌曲 还是未免会感到伤感。
  不过都无所谓了 现实总是有残暴的一面。
  有谁一直陪我到最后 有谁从未离开过。
   
  有谁真的懂我。
  有谁知道我想过的未来是什么样的。
  谁知道我看待某事件到底抱的什么立场。
   
  没什么好自怨自艾的 始终陪着我的只有影子。
  懂我的只有我自己 该激励自己如何去斗争的还是自己。
   
  永远都 只有一个自己。
  
  
  
  
  我不想多说一句话 我不想说明那些过剩。
  我只想安宁静静的 哪怕是一个人 我也不再去奢望谁爱我。
  我厌恶当初的自己 我想转变 可是又怎么。
  我心里的那扇门很久 很久没有翻开了 已经凝固了。
  我忽然认为自己安慰别人说的那些话很低微。
  一个人难过的时候就塞着耳机 把音量开到最大 全世界与我无关。
  一个人开心的时候对谁都很好 认为我神经兮兮的。
  一个人漫步的时候回忆那些曾经那些过往再美也只是曾经。
  一个人脆弱的时候告知自己无论如何都要坚持下去。
  每天的我就是这样渡过 我学不会伪装。
  每天的生活反复的轮回着 我也在尽力着。
  
  
  
  
  今早起床前我好像看到了另外一个世界的本人,
  一缕阳光照在了我的脸上,我惊奇了它的漂亮,它的温暖,也许是在提示我,
  你的世界不仅有黑暗,悲伤,也有阳光,Cheap True Religion Jeans
  从前的我疏忽了这一点,我想我该结束这一切悲伤。
  我想简简单单的过下去我仅仅指的是人际交际我不想理睬人道的昏暗。
  我试图把每个人都想得那么完善但总是大失所望。
  我老是被迫的用伪装来维护自己这样好累。
  至少我否认我现在的年事不应当去蒙受这些。
  我已经挥霍了很多时光。
  该去踏上寻找一个人的阳关的路。
  
  
  
  
  
  我是个敏感的人 会想很多的事情给自己找难过。
  所以天天都谨小慎微的生活着 胆大妄为的对待着身边的人。
  是不是有一天醒来我领有的所有都会被收走。
  而后就只剩下我一个人孤孤独单的生涯。
  我惧怕这样 所以我每天都会想很多很多的事情。
  本来是想化解那份不安 可每每都是相反的。
  想的越多只会让我越不安 感到自己就像易碎的气球很难捉住幸福。
  只能跟着风在天空不安的沉没 风停了就坠落在地面 然后粉碎。
  
  我坚持的 有我该坚持的吗 我探索不到。
  
  道义黯然的人们 迟迟不肯的我我我我们。
  诚心诚意的君子 断断续续的停停停留着。
  曾经 我也有那么那么多朋友的 友谊对我来说 我很珍惜 现现在。
  不是我想珍惜就能珍爱得来的 那么我也可以洒脱的放开这底本不。
  该属于我的一切 走吧 走吧 人总要学着自己长大。
  
  永远记得那句话 人还得靠自己到底有谁能够义无反顾付出一切却不求回报。
  一次次的被诈骗以后我发现原来连自己以为是关系很好的人在金钱面前也都是一样。
  当你们冷漠的表情浮动在我面前的时候我就没盘算再把你们任何一人放进心底。
  你们都是一样的 谁都不会承认自己是个贪得无厌的人而你们在我眼里却都一样。
  
  
  
  
  
  
  
  一些人遇见了 一些人失去了。
  兴许生活就是这样。
  四季流转着。
  最后又会留下谁陪同在身旁。
  仿佛开端越来越多的失去取代了所得。
  那些岁月中深深浅浅的痕迹。
  那些无法定格的记忆 又要如何取舍。
  寻一杯冰凉的水来拯救干渴的喉咙 。
  写一些难过的文字 记载着一些琐碎的生活。
  十指相握给自己取暖 只能保持的霎时 。
  谁说 懂得放开心怀便会坦然。
  我微笑 是不是真的理解玉成。
  
  
  
  
  
  在岁月里的回身。从一个熟习到另外一个生疏。
  再从陌生改变到熟悉。直至一场场的青春的帷幕匆匆的闭幕。
  在青春的酸甜苦乐里稚气里的理想渐渐的褪去。
  
  
  
  
  人总是这样一种庞杂的动物。
  属于自己的时候不去珍惜。
  等到失去了在看见别人占有的时候。
  才会觉切当初的机会是如许的难能宝贵。
  然后就会想如果再给我一次机遇。
  必定不会再去重复曾经的故事。哈哈。 多好笑阿!
  
  
  
  
  
  开始变的成熟是用苦楚的生活换到的。
  想要追赶幻想的时候是充实的时候才决议的。
  睡的最舒畅的时候 是忙到最累的时候才发明的。
  曾经生活在一个单纯的格子里无牵无挂。
  后来学会了离开这样一个货色。
  我来到了很多 更复杂的格子堆里。
  你援用书上说的我们像是两条平行线总是没有交加。
  你模拟电视上说你像锋利的刀片总是割伤别人和你自己。
  你到底什么时候才能做自己。
  友人 我对你怎样 你心里比任何都该明白,gucci watches
  既然我这样取舍 定不会让你找到 省省力量吧。
  让我知道本相后还假装没事人样跟你持续打打闹闹吗?
  我做不到 至今都无奈信任你竟瞒了我这么长时光。
  无法原谅。
  
  
  
  
  不在后悔自己现在做的任何一件事。
  想到什么就英勇的去做。喜欢怎么样就怎样。
  因为我还年经。错一下没什么。至少不会在年华散失之后一边回想一边叹气。
  虚伪。假仁假义。这些算什么。做好我自己就好了。用对自己的心对大家就好了。
  所以。就像现在这个样子活下去把。一定会幸福的。
  
  
  女人哭着说她损害了良多男人。
  男人笑着说 你只是在伤害你自己。
  女人冷冷得说 她不能原谅伤害过她的男人。
  
  
  
  
  
  爱一个人你会记得和他在一起的日子。
  深爱一个人你会记得和他离开的日子。
  
  
  
  
  有多少男人会真正懂得爱护年少时陪在自己身边的女人。
  用青春去做赌注等你们的女人。
  这个女人陪我度过多少夜 拿青春跟我赌 我有什么理由不珍惜。
  多好的一句话可是不是对我说的。
  
  
  
  
  
  男人抽了一终日的烟。
  却写不出一封情书给他的女人。
  只好把那只孤单的烟盒 警惕的烧掉。
  火光照亮了男人 正流泪的脸。
  
  
  
  
  
  忘却一个人
  并非不再想起而是偶然想起
  心中却不再有波涛真正的忘记
  是不需要努力的
  每个人的电话本里
  都会有那么一个你永远不会打 也永远不会删的号码
  每个人的心里
  都会有那么一个你永远不会提 也永远不会忘的人
  岂非不是吗?
  
  世界上最凄绝的距离是
  两个人原来间隔很远 互不相识
  突然有一天,他们相识,armani black,相爱
  距离变得很近
  然后有一天,不再相爱了
  本来很近的两个人,变得很远
  甚至比以前更远
  男人走过夏日的午后
  才发现自己还衣着女人送的玄色大衣
  男人这才 忽然的想起
  本来女人的分开 已经是去年冬季的事了
  
  是不是真的要到,等我忘记了你。
  是不是真的要到,等我废弃了你。
  是不是真的要到,等我离开了你。
  你才干真正地知道,我于你而言,也是那么主要。
  有多少人能一字一句的看完俄的每一段哀伤,jp tods
  有多少人能读懂密密麻麻黑色字体里的失望。
  有多少人晓得冷淡和凉薄语言后的皮开肉绽。
  我就是我 是色彩不一样的烟火 天空海阔 要做最刚强的泡沫
  我喜欢我 让蔷薇开出一种成果孤独的沙漠里一样盛放的赤裸裸
  孤单绝对的生活 算我活该
  难以释怀的无奈用缄默替换
  抉择在人群离开是种伤害
  就当我不分黑白 不知好歹
  有些累赘是自己硬塞给自己的。我们都会抚慰别人可对自己却做
  不到那般明白。我们都会自欺欺人。我们都说过去就是过去。可
  从前毕竟是过不去。
  失眠的晚上过去就犹如一头饥饿的兽。猖狂的侵蚀着每一根神经
  刺痛着每一寸皮肤。我们会笑着说我很好只怕懦弱被看穿。可努
  力扯起的嘴角是那么的不天然。
  同样的喜欢着黑夜却又害怕着黑夜。会怕那些无孔不入的寂寞和
  撕心裂肺的记忆。我们假装着自己。实在的痛和虚伪的笑却是自
  己始终不肯抛弃的折磨。
  良久前就喜欢的歌。王心凌唱确当你。假如有一天。我回到从前。
  回到最原始的我。你是否会觉得我不错。
  不知道该要怎样去描写。不知道该要怎样去表白。挽留的话哽咽在
  嘴边。没有谁也都是一样生活。
  就像是有大块脱节的时间。 遗忘还是铭刻。可能直面青春惨淡。
  学会追逐实际。明争暗斗不管对错。
  许多年当前回首看最初。庆幸你身材安好。庆幸我仍然是我。
  我们在事实里挣扎,就如在最悲凉的旷野单独绝唱。
  青春是一场盛宴,我们纵情的浪费,颓丧却又寂寞不堪。
  某一时刻延着我们指尖的脉络,情感从其中促流走。
  我们肆意浪费着自己,恋情眼前我们还都只是孩子。
  在那世界里,咱们不对错,却在永远一直的争执。
  一曲悲歌之后,我们泪流满面,下一曲是不是还在等候着我们。
  我知道山高水长实在并未几,就在你拥入怀里的那一刻。你转
  身离开便海枯石烂。
  今生想着我的前世,盼望着我来世,只是是下世我还记得你吗。
  我以为两个人在一起的理由只是两颗心之间的彼此吸引
  无关金钱 权力 愿望的引诱 只是单纯的爱好跟你在一起
  我以为付出的理由只是简单的想要对你好 再好一点
  我没有措施放弃我的尊严我的自豪 我不能背离我的心
  谅解我还在为我的幻想而保持
  感情很轻,有些人可以轻而易举的拿得起放得下。
  感情很重,有些人只能一次举起,而后再也无力承当了。
  感情很美,让有些人不论跌到多少次都要爬起来都冀望着。
  当你爱的逝世去活来时,你们分别了。
  当别人爱你爱的死去活来时,你心冷了。
  难道有些人呈现了注定是用来遗忘的。
  常据说人心叵测,莫非感情间也实用吗。
  爱情的力气是巨大的,可恶情的悲剧又多大。
  我并不是生成爱寂寞 却比任何人都多
  就算把世界给我 我还是赤贫如洗
  我要快乐 我要能睡的平稳
  有些人不抱了才暖和 离开了才不恨
  对与现在的我们 许多都是虚伪的 世界是虚伪的
  生活是虚伪的 每个人都躲在一张虚假的面皮下苟延残喘
  虚伪不是虚伪的 虚伪是真实的 哪怕闭上眼睛都感触
  在现在寂寞的时候 想起你来 便会微微一笑
  然而 再美妙也经不住时间
  一切 来不及疼痛 来不迭流泪
  我只是悄悄的过着自己的日子 然而把所有都看淡了
  我不清楚我到底还在寻找着什么 寻求着什么 纪念着什么
  我想把你给我的一切全体还给你
  可就在还的这一刻 我发现我还不起
  因为它早已深刻骨髓
  你走后 温度都冷却了
  你斑驳的思维太过波折,我参不透辟,
  我把你的爱好全都记得,却给不了你一点快乐。
  所谓忘了你 只是应付自己
  寂寞像是一滩死水
  这份年青没阅历过风雨的感情
  逃不外风言风语的桎梏
  不敢请求你专一 因为我知道你做不到
  有你在 性命结束也无所谓
  有太多的情感,找不到恰当的表情。
  不须要别人的庇护
  我清晰那些呵护无法带到以后
  不需要别人的疼惜
  我明确所有的疼惜不会永远 至此停止。
  有时候还会溘然很理性。想一些没有结果的旧事。疼痛快慰难过屈
  服。你的生活早已经没有我脚印。
  或者那时候你真的感觉不快活。在你眼里我有诸多不好。嘘寒问暖
  让步姑息。不能把自己地位放到最低。
  缓缓也已经平心静气。究竟时光善于遗忘。看过多少爱恨纠缠。依
  然悼念曾说好要毕生相依。
  仍是要埋头拼命往前走。让我不懊悔。让你看得起。
  
  Reply With Quote

Sponsored Links
Old 06-11-2011, 03:17 PM   #2
g8m8n2yf
General of the Army
 
Join Date: Mar 2011
Posts: 1,857
g8m8n2yf is on a distinguished road
Default

| Back to logs list

Reprinted from alumni of the user at 12:51 on October 6, 2010 Reading (loading. ..) Comments (0) Category: Look

asphalt concrete pavement construction problems and solutions

With the rapid development of modern high-grade highways, asphalt concrete pavement has been widely promoted, and formed a pavement structure, material
materials, construction and testing as the core set of technologies, construction technology has been greatly improved, in part
asphalt concrete pavement technology and quality in general is at or near the international advanced level. However, the quality of asphalt concrete pavement by the personnel, materials, equipment, technology
process and the level of environmental and other factors, as well as the complexity of asphalt pavement construction process, system and relevance and impact of constraints
. Therefore, the necessary monitoring mechanism is very important, as the supervision of the construction units should be required in strict accordance with the approved construction design
and regulatory requirements for proper and orderly construction.
road construction in every process, every element of our overall quality of the final direct impact on the road. Therefore,
only on the various processes are to be monitored carefully in order to guarantee access to qualified asphalt concrete pavement.

one.

Asphalt concrete mixing process of asphalt concrete mixing and asphalt quality from time to time there will be instability or volatility is high, any kind of asphalt
all this green mixture, in the standardization and mechanization of the assembly line construction, are difficult to ensure the quality of asphalt concrete pavement. For example, uneven temperature or the mixture of different specifications of the original composition of mineral aggregate production variability is not large or regular testing for a variety of different specifications of mineral aggregate particles will lead to current values, changes in porosity, thus affecting road quality. So we will be taking a daily screening test and the results were analyzed longitudinal exchange, making it the basis for guiding the production and asked to adjust the proportion of cold bin; also require the construction unit must strictly control the mixing floor vibration sieve hole size. Practice shows that the control of the following sieve size is appropriate.

1 # sieve grading control the maximum size = + (1-2) mm
2 # sieve = (level with the maximum size of -5 mm control) / 2 + (1-2) mm
3 # screen = 5mm + (1-2) mm
4 # screen = 3mm
so appropriate adjustments can do, how to crown a new paragraph with the three-lane asphalt concrete choice AC25 sieve 33,16,6 ,puma running shoes, 3 shaker better.
asphalt concrete mixture in order to maintain proper quality, we test supervisors full-time course of routine testing have found that question for timely corrective treatment.


-type surface layer of asphalt penetration procedures and requirements of the construction according to the following:
one,puma outlet store, setting out and installation of curbs.
Second, clean the grass roots.
three, poured through the layer or layers of asphalt. Thickness of 4 to 5 cm penetration pavement should be poured through the layer or layers of asphalt.
four, and threw the main floor stone shop. Paving stone the size of particle concentration should be avoided and should be checked for loose lay thickness. Vehicles should be prohibited to pass on a paved stone floor.
V. rolling. After the main floor stone paving should be 6 to 8 tons with the initial pressure roller, the speed should be 2 km / h, rolling should be gradual shift from the road edge of the road center, overlapping each wheel track is 30 cm, then from pressure the same way the other side to the road center. After rolling over the road humps should be examined and vertical slope, when there not meet the requirements should be flexible flat and then pressure, and should be rolled two times, the stone is basically stable, with no significant passage of time so far. Then 10 to 12 tons roller (the thickness of a large penetration pavement roller can be 12 to 15 tons) were rolling, each round of the track should overlap 1 / 2 or more, and should be rolled 4 to 6 times, until the main floor stone embedded crowded close, so far no significant wheel tracks.
coagulation on the asphalt mixture at the type of mineral aggregate maximum size can be divided into coarse-grained type (LH-30 and LH-35), the grain type (LH-20 and LH-25), fine grain type (LH-10 and LH-15), and sand type (LH-5).
asphalt mixture can be divided into coarse gravel-type (LS-30 and LS-35), in grain-type (LS-20 and LS-25) and fine type (LS-10 and LS-15).
standard asphalt concrete mixture porosity remaining after compaction, can be divided into: Ⅰ type: residual porosity of 3 to 6% in urban road 2 to 6%, the sidewalk system is 1.5 to 5% and Ⅱ: the remaining 6 to 10% porosity.
mixing asphalt mixture shall meet the following requirements:
one, according to a single feed ingredients and mixing, and strictly control all kinds of mineral aggregate and asphalt content.
Second, the control of various materials and the heating temperature of asphalt mixtures.
Third, after the asphalt mixing uniform, no gray, no separation of coarse and fine material and Cluster into blocks and so on.
four samples in each class to do asphalt mixture performance, composition of aggregate gradation and asphalt content tests.
five, the end of class mixing, cleaning the mixing equipment, vent pipes in the asphalt. Make the inspection records, do not meet the technical requirements of the provisions of the asphalt mixture should be banned factory (field
II. Quality

paving paving quality directly affects the overall quality of the road, so this
our asphalt concrete pavement construction supervision in the process of focus. In addition to paving the quality of work and machinery related to the performance itself, but also depends on the paving of the continuity, stability, uniform, as well as the balance of feed and other factors, so this stage also more problems, such as:
(1) non-uniform thickness of asphalt concrete pavement is always an objective reality, it will cause spread coefficients in the same song with different thickness of the compaction effect resulting in different surface roughness to influence. Therefore, in addition to improving the flatness of the grass roots and elevation control, should also strengthen the following asphalt pavement roughness and elevation of the monitoring, so that some compensation, strict control of up layer by layer, until the top layer.
in exceptional circumstances, to ensure the pavement thickness, then take the appropriate height adjustments to ensure that the thickness of pavement structure.

(2) paver and shops there will be some distance after the two-way slope, which is a great influence on pavement roughness. Repeatedly verified by arch gravity sag and screed and screed paving temperature preheat temperature difference in temperature between river size. Therefore, we require screed preheating temperature not lower than 80 ° C, with water level leveling and screed under the support plate to determine the thickness (the thickness of support plate thickness = pine + ironing board preheat shop camber + grass-roots level error, generally require a five fulcrum). Especially when the whole lot of paving, the paving should be adjusted before the arch of the same slope, and timely adjustments, in particular to stop before spreading to check, adjust,puma sneakers, to avoid seams when the second high in the low road width .

(3) paver and paving screw feeder walking speed dial does not match the material spreader room too much or too little product, resulting mixture under screed thickness away from the pack, we ask that spiral windrow paving mixture indoor flush to or slightly above the height control screw axis line of paving. Especially the spiral phenomenon spreading device not idling.

(4) uneven paver walking speed, the speed of uneven paving, asphalt road surface waves, seriously affecting the smoothness and degree of compaction. Therefore, we request that it shall ensure that 3 ˉ 4 m / min speed of walking, try to avoid downtime. Case of a shutdown, lock screed paver should not make it sink. Pause time in temperatures above 10 ° C should not exceed 10 minutes. Pause for more than 30 minutes or mixture below 100 ° C when the cold joints in accordance with the method to re-seam. Paver to ensure that at least three cars before material to be spread, to minimize downtime and avoid the formation of waves.

(5) in the stability of walking on the paver, the following types of questions often:
a,puma kids shoes, paver track online because of the discharge and withdrawal of driving down the aggregate is not promptly removed , resulting in abrupt paving thickness. Therefore, in the construction process, construction personnel supervision and inspection at any time, in order to avoid this from happening.
b, truck reversing impact paver, pavers caused distortions forward, leaving the road surface convex blank, we ask that the process of continuous paver, paving haul trucks should be at front of stop at 10 ˉ 30cm , and neutral gear, relying on the slow push forward paver;

(6) in the construction of middle and upper classes, because leveling beam (drag bars) stiffness, and deflection is small, landing wheels and skis much, its own weight distribution is reasonable, walking stability, so we asked to use leveling beam, which is to improve road surface roughness and thickness played a very good effect.

III.

Rolling rolling technology is mainly bitumen surface forming process is to ensure the quality of its physical and mechanical properties of the road and features an important part of the design requirements, but also the last one in asphalt pavement construction process. Supervision requirements in the baking our responsibilities to the people, valet operation, found to be in place promptly corrected, and requested the construction unit to note the following:
(1) the rolling over, pushing the road cracks often occur that the stability of asphalt concrete pavement has a great influence.
Therefore, the initial pressure, final pressure of rolling temperature of timely detection, to ensure that the final pressure within the design requirements.
(2) roller surface in the new paving on the fast start and brake firmly not allowed to require skilled, experienced drivers
operation;
(3) of asphalt concrete surface water caused by excessive cooling too fast, so that the surface cracking of asphalt concrete, so the roller wheel on the water should be strictly controlled, as long as you can stick round, the impact of rollers rub the effect of asphalt concrete.
(4) checked before using the tire means the tire roller wear and pressure are equal, defense is not soft and hard on the tires
one of the lateral surface smoothness.

IV. Site sampling and testing

trial would often test out the results and the actual difference more, so we asked to do the following:
(1) asphalt samples by statistical methods to determine the set aggregate gradation of asphalt content, compaction of asphalt aggregate sampling locations in the pre-mixed with hot mix of people next to the device, asphalt content tests should be behind the paver and roller in front of the mixture from the paving samples, compaction test concrete pavement should be good to take the sample pressure to get test results, if errors or paving immediately mixing plant site, and make the appropriate measures.
(2) mixture to take a sample every kind of mix 500T, the results from our approval.
(3) When the construction unit to make tests on the various indicators, self-parallel experiments to do in order to make use of its review.

five. Seaming

asphalt pavement joints are unavoidable operating interruptions and two cases with the structures of the joints, joint position focused on the impact of surface roughness of the adverse factors, the quality is good or bad quality of road significant impact, in order to improve the quality of joints required to take the following measures:
(1) its cross section cut by cutting sewing machine to ensure the joint is a vertical cross-section.
(2) slit position must be checked by three-meter ruler, rolling the joints due to the collapse of the previous total removal of the site, to reduce the length of
removal of part of a small, paving the end of the paver Vibration rammer hammer vibration to the paving to the end remained
(3) when the roller rolling landscape rolling gradual transition from cold to hot, and repeatedly filled with fine material fact, until the ruler seized by three meters
check reach the required standard so far, to begin vertical rolling.
(4) and the joint structures like the beginning of side seams with the cold, artificial paving the terminal segment to be hung flat, fine grind materials provided
pressure side of the side, to have skilled operation, in the short time to complete, to ensure the rolling temperature.
(5) with the structures joint before the first primary joints carefully check whether the flat, rolling is compact, compaction,puma 2010, such as
how, from the boundary between rigid-flexible multi-baking to ensure flatness.

2. Pavement Deflection Testing of new technology
Pavement Deflection of flexible pavements is a major target strength measurements. Pavement Deflection refers to the required standard axle loads, road surface wheel gap will occur in the total vertical deformation or vertical rebound deformation. New detection methods are the following.
2.1 Deflection of laser detector method
in the determination of time. The detector fixed rear wheel cars on the road gap. Use of the car left the road during the measured point rebound, driving the original fixed on silicon photovoltaic cells on the ground, rising up the probe, so that the laser beam emitted by the laser light shines into the pool of silicon photovoltaic photocurrent. According to the size of light to calculate the surface current value of the springback deformation, that is the road Pavement Deflection. This deflectometer simple operation, high accuracy, the reading is stable, small size, light weight, low cost and easy to develop, and the other to rely on the light as the detector arm length, you can shoot very far. With narrow angle laser light spot is small and bright red, 10m of the far still clearly visible, can be used for rigid pavement deflection testing.
2.2 Automatic Deflection Tester Method
section of the detector on the detection of the role of the tractor to a certain speed, the determination of deflection analyzer on the chassis front end beam and supported on the ground to remain intact, when the rear wheel gap through the probe, the deflection device through the displacement sensor, is automatically recorded. Then drag the beam is measured to two times the speed onto the next measuring point tractor. Forward cycle of continuous testing. Can be output through the computer section of Deflection results.
the determination of continuous driving cars in the determination of the case carried out. It can be on the road for high density point intensity measurements, for road construction quality control, inspection and road maintenance management.
2.3 Falling Weight Deflectometer (FWD) method
FWD is through computer-controlled hydraulic system under the falling weight equipment startup assistance, so that the quality of the hammer will free fall from a height, the impact force on the load board and spread to the road, causing pavement deflection, through the distribution of : measurement points at different distances from the sensor detects the deformation of the surface structure, the signal input into the computer record system. The measuring point by way of deflection cylinder. FWD measurements are computer automatic data collection, the progress of fast, high precision. Detection of the maximum speed of up to 80km / h, built-in FWD traction device speed can be greater than 100km / h. The method is a very good full dynamic non-destructive testing equipment.
3. Pavement Detection Technology
road pavement surface roughness can be defined as a vehicle to induce vibration of the exercise of elevation changes, it is an important pavement performance indicators. Therefore, flatness of the road construction and maintenance of detection is a very important part.
roughness test equipment section is divided into two major categories of class and reaction type. Uneven road surface type determination section case, the reaction determination of road surface roughness class level. Currently, the section type of equipment, including 3m straight edge, continuous and laser flatness measurement instrument, such as Pavement, the reaction type of equipment, including vehicle-mounted bump cumulative detector.
3.13m ruler
test light to 3m straightedge placed on the road, will be moved to the end of the drawing instruments, drawing instruments by hand into the other end. In this process because of the uneven pavement, drawing instrument measured the following round needle up and down movement with animation, while at the transmission roller wheel, driven wheel rotation, and move the tape drive, the synthesis of the two movements will be painted the needle Tape down the road on the drawing geometry, and thus obtain the surface roughness values.
3.2 Continuous flatness meter
measured by the person or vehicle pulling forward of the instrument, due to uneven pavement caused by measuring the ferry up and down swing, and promote the displacement sensor measuring rod slot in the sensor hole slide up and down. This potential according to the positive and negative sensor output to determine the size and surface roughness.
greater flexibility in the use of such detector, one can drag, but also broaching, but the test efficiency is low (detection rate of ≤ 12km / h) of the method is applicable to the determination of road surface roughness, assessed the road construction quality and use of quality, but does not apply to existing large pits, determination of serious damage to the road.
3.3 Laser Pavement Analyzer
Laser Pavement Analyzer is a equipped with laser sensors, accelerometers and gyroscopes in the determination of car, it also has advanced data acquisition and processing system. Work is to test the speed of vehicles on the road to a certain exercise, fixed in a row on the chassis to pass the test laser beam laser sensor reading of the angle is reflected back to the road test, the test car fitted with the signal from the accelerometer signal to each other poor self-test vehicle to eliminate the bumps, the output section of the road the real signal. Signal processing system will come from the laser sensor analog signals into digital signals and record them. With the car moving, pitch intervals, a data collection. Through data analysis system that can display print international roughness index flatness test results.
such analyzer is a non-contact with the road surface measuring instruments, test speed, high precision. Vertical section of the road can also, cross slope, rutting and other measurements, so the detector has a broad application prospects.
3.4 meter vehicle-mounted bump cumulative
test vehicle when measured to a certain speed on the road to exercise, uneven pavement caused by vehicle vibration, the rear axle by a mechanical sensor measures the displacement of the same car one-way between the cumulative value of the VBI, in cm / km meter . VBI greater, indicating that the worse the pavement roughness.
cumulative vehicle-mounted bump road surface roughness measured by speed, low cost, easy to operate. The test results can be assessed the quality of road construction and use of comfort.
4. asphalt pavement fault testing of new technology
road often occur in the course of a wide range of damage. Damage not only affect the pavement performance and structure of the bearing capacity of the structure will affect the pavement performance. Therefore, the asphalt pavement fault detection, for asphalt pavement maintenance is important. Currently, more advanced methods of measurement at home and abroad are: camera measurements and ground penetrating radar method.
4.1 camera measurements
camera detection technology, the basic principle is to be installed on the car in the determination of special fast or high-speed video camera at a certain speed and certain camera angles, the road specified entry Cassette various diseases, and rapid processing in the field or indoor into data of a detection technology. The method is advanced, low cost, will become the road for some time the main means of damage detection.
4.2 GPR
car equipped with ground penetrating radar on the road driving a certain speed, ground penetrating radar, electromagnetic pulse transmitter, and through the road in a short time, the pulse reflected wave received by the wireless receiver, data acquisition system records returned When asked in the pavement structure and the dielectric constant discontinuity mutation. Pavement materials each layer distinctly different dielectric constant, therefore, dielectric constant mutation Department, will meet the two structural layers of the interface. According to detect a variety of road material and the dielectric constant velocity, you can calculate the thickness of each layer pavement or given water content, damage location information.
Ground Penetrating Radar Detection
thickness of asphalt pavement, pavement void, crack, fall, air streams and other diseases. The detection rate of up to 80km / h or more, the maximum detection depth of more than 60cm. At present the road non-destructive detection, ground penetrating radar has achieved good results,shoes puma, but also the broader applications.
5. Conclusion
To sum up, the detection of asphalt pavement technology is evolving. From static to dynamic test development testing, from manual methods to automation by the nondestructive testing damage detection to the development of detection by the single test to integrated development. The speed of detection and faster, increasing efficiency, the results more accurate.
g8m8n2yf is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 08:54 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum