1, waterproof construction should use waterproof coating
2,
Puma Australia, waterproof construction projects should be completed and in the secluded approval do
3, waterproof construction is complete water test done 2 times
4, bathroom waterproof layer should not be less than 1.8 meters
5, floor drain, yin and yang, angle, pipes and additional locations to do a waterproof
6, use the savour floor drain floor drain
7,
Pumas, hot and cold water pipes left and the right heat cold
8, water from the ground and attempt not to go
9, the cold water pipe in the wall have 1CM membrane of conservation, hot water pipe is 1.5CM, so to open a deep trough
10, PPR pipe is installed stickers, prepared to consider the thickness of the tile, so the tube will not reveal to
11, merely a few minutes cooking, vegetables take a long time, Pelton have to buy colossal
12, guiding and basin should be coordinated, to pretend not to repair up the
13, the toilet installation can not use cement, use silicone
14,
Women Puma Baylee Future Cat, lavatory, faucet installation is completed we absence to protect
15, to consider while buying toilet toilet pit
16, washing machines or to consider is the drainage below the drainage
17, the bathroom is best not to tel, and easy to damp
18, the bathroom mirror first consider a good size, otherwise the mirror is very easy to install headlights tall
19, lavatory Pipeline best left manholes
20, mighty power in the feeble can not dress the pipe with a
21, left naught and right respective to the ground
22, power afford socket 300 from the ground, switch 1.4 m
23, switch not installed in the door after
24, outlet should be a lot of good
25, 16A socket with electrical power, such for oven, etc.
26, cassette to use agreeable
27, cassette and plate must be complete, or they may not installed on
28, PVC wire and wire cross-section tube district shall not surpass the conduit cross-sectional space of 40%
29, bedroom air-conditioned not to implantation
30, ventilation holes disposed to consider the appearance, otherwise rain will come
31, light too think the dual control
32, the best bathroom installation splash outlet
33, on the balcony to consider a socket
34, to smooth perpendicular and horizontal wire ducts , line up according to, after the easy to use them
35, the common flue to setup non-return valve
36, bought the utensils must be good for personnel to peruse the directions
37, manual and insurance card and other information must remain good
Mason
38, the cement over the factory as 3 months can not be secondhand
39, different varieties, name The cement can not be mingled
40, yellow sand must use creek sand, to know his mouth savor savor
41, wall and floor tiles to overrunning more than two hours, dried and can be spliced
42, would prefer purchase a few chips of ceramic tile, do not purchase fewer, or prone to colorful aberration
43, the wall can not have 2 rows of non-full brick
44, completed seam rub quickly after the clean up of the tile
45, the ground paste marble (light), stone back to do water
46, Yang corner to cut 45-degree angle
47, floor tiles to the floor drain by the incline, or effortless water
48, pipe wall along the jaws in the fashion of cut sets to be used, so it looks or the block of brick
49, should be dry ground cruel shop
50, must be dirt floor tiles, slip, do not light to look good
51, matt tiles laborious to clean up
52, to the balcony floor tiles Note the drainage way
woodworking
53, the keel is best to use dry larch
54, bought a large wooden board saw dry after the essential
55, entering the premier melodrama house wood curtate
56, color panels come in to buy a paint brush another, to prevent filthy
57, ceiling fans can not be installed in the ceiling keel
58, when pre-construction color panel to elect the color
59, bars hanging from the ceiling of the wall shall not exceed 300
60, gypsum embark to use countersunk head self- tapping screws into the board 1 ~ 2MM, anti-rust management and do not hook gun
61, gypsum board shall not be greater than the distance between the nail 200
62 , gypsum wall board with a 3MM seam for crack dealing
63, gypsum board to do the best sun angle at the angle of the sun protection
64,
Women Puma Ferrair Drift Cat, peeping at the upper and lower doors To paint
65, the bottom of the bathroom door pocket to swipe water
66, door size should be loyal
67, wood furniture, try not to do, do can be done in
68, try to buy a entire closet, carpentry done, the chart does not go
69, the size must be considered in good alteration up is more distress
70, sliding door to do their own do not do black orbit, not path to repair the hereafter
71, then try to do a small bathroom sliding door, do not open the door, characterizing the local
72, not sure of the carpentry foreman must be extra commutes with, do not let them self-assertion
73, money in hand is the last word
74, have children at family, the glass should less
75, be sure to let employees take to look the drawings
76, the kitchen drawer useful
77, wooden keel floor flatness is 5MM
78, Mao paved floor to 30 degrees or 45 degrees, between the board and board to stay 2 ~ 3MM, joints should be staggered
79, among floors and wall to reside 8 ~ 10MM suture
80,
Puma Fluxion II, the width of laminate flooring over expansion joints to consider when 8M
81, to reduce the use of MDF Door
82, hinge and hardware must use good
83, Yuba wood to be installed in the keel, tin not be instantly installed in the ceiling on
painter
84, in dark latex Try not watered during the construction of paint, or prone to chromatic aberration
85, gypsum board seams to be on the ribbon
86,
Puma Ferrari Shoes, the walls where there are gaps to be better above a really cool cloth
87, the best to eradicate the incipient wall and some putty or glue brush again Sealing
88, try to buy renowned brand of paint, elaboration company suggested or not recommended at the boss of the best known Do not use
89, the weather is too rainy, do not paint brush
90, paint, paint polish to dry entirely after such
91, under a construction must wait ahead a paint paint dry after
92, the metal surface of the paint to do oxidize treatment
93, the weather is too chilly, the paint will be of meager construction quality
94, when the door paint, use masking stick hinge and door locks
95, days of peppery, pay attention to ventilation
96, wallpaper paste, food vegetable fuel to brush the wall
97, wallpaper paste, ought the switch, socket panel cleared to
98, light, silky cream paint to a complete supplement of prone to chromatic aberration
99, after skirting installed to use putty and latex paint make up almost seaming
100, frosted glass to use news to protect the
TOP