yesterday afternoon,
talking watches, close the Subway Line Phase II construction site staff apt the Young Mr. home viewing. Staff said, from the surface, into the muck capability of approximately half a ton.
more than residents of the hospital, said the hospital houses were built in the 50s of final century, a total of about 40. Recently, Subway Line Phase II project started planning tunneling fair underneath the hospital. Residents guess namely the incident with the metro construction related. Mr. Li Lao residents said the incident we must retard on their houses,
abercrombie and fitch wholesalers, fearful of a alike situation occurred, Another dweller said, the sensibility here is housing security is intimidated, have begun to pack up, ready to move out for soon for likely.
by midday yesterday, the reporter saw in the Yang family,
christian louboutin for 3.1 phillip lim, was into the outer room. Smooth surface has been solidified in the mud, and some local cracking.
Chengshousi Road, South Hospital, No. 65 double-pole 1 house, 1 night suddenly It rotated out that the incident outside the house is 30 meters underground site, the site in order to prevent ground sinking into the mud to the ground, the suspect through the rat hole mud into houses.
>> shocked
dirt from the underground site
The whole room was fraught with mud, the behind room was the top bedside closet, the outer room of the bicycle was sealed. Mud stream from the back room outhouse. Mud lumps formed behind solidification. Blocked the door, the landlord tin merely jumping via the skylight to take his family journal.
. One night, the room arose a massive number of gray coagulum, beds and some furniture was from the top, and had some debris aboard the floor were buried.
text / correspondent Han Dapeng map / reporter Pan Wang
Mr. Yang said he lived in this room on weekdays, due to the current
chilly weather at night, the room is not heating, the daytime before he moved to the next room to live. > neighbor maneuvers to shake the compound
human in charge of the construction site, there is Chengshousi Station site,
dark wind max 老人屋里堆满垃圾只能睡楼道(图), near the space from the underground tunnel is indeed passed. Pre-construction,
christian louboutin studded slingback pump 网帖曝两名男子身, professional hospital on several occasions to the 65 examine, and the circling terrain for testing. But every investigation,
best prices on rolex watches,
lowest amount rolex watches 组图:印度盲童表演传统钢管舞, the episode either doors locked house, so the probe can not be home. Project began, in mandate to discourage ground subsidence around the zone,
christian louboutin forever tina boots, the construction side on precarious ground into the mud, to reinforce the permanence of formation. After mud began to quell the injection, and the bases of the incident may have rat holes housing, the pressure led to the mud from the chasm ejected.
The responsible person said, the family had adjoin with the owner, the mobilization of manpower to go and talk how to clean up the aftermath. Meanwhile, in the proximity of the site has sent 24-hour patrols. If residents find home in unusual circumstances, they can promptly advise patrol commanders ambition be sent amenable to survey the construction side.
>> figure out the
emerges to build a house for no reason mud